Connected Kerb · EV charging site
Castle Road Car Park 1, Sandgate
Castle Road Car Park 1, Sandgate, Folkestone, CT20 3AQ
Castle Road Car Park 1, Sandgate is an EV charging site in Folkestone, Kent, run by Connected Kerb. Both of its sockets are 7 kW Type 2. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Shell MGF Folkestone (MFG EV Power), 0.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Connected Kerb
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Castle Road Car Park 1, Sandgate (Connected Kerb)?
Up to 7 kW AC via Type 2.
How many charging sockets does Castle Road Car Park 1, Sandgate (Connected Kerb) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Castle Road Car Park 1, Sandgate?
Castle Road Car Park 1, Sandgate is on the Connected Kerb network.
Where is the nearest charger with 50 kW or more to Castle Road Car Park 1, Sandgate (Connected Kerb)?
Shell MGF Folkestone (MFG EV Power) is 0.9 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Castle Road Car Park 1, Sandgate (Connected Kerb)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Castle Road Car Park 1, Sandgate (Connected Kerb)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Castle Road Car Park 1, Sandgate (Connected Kerb)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Wilberforce Road Car Park 1
- Best Western Plus Burlington Hotel
- Shell MGF Folkestone
- Battery Point Car Park 1
- Broomfield Road Car Park 1
- Civic Center Visitors Car Park 1
- Fastest nearby
- Shell MGF Folkestone · 50 kW · 0.9 mi