Connected Kerb · EV charging site
Conyngham Hall Car Park
Bond End, Harrogate, HG5 9AL
Conyngham Hall Car Park is a planned EV charging site in Harrogate, North Yorkshire, run by Connected Kerb. All 12 of its sockets are 7 kW Type 2. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is St James Retail Park (Be.EV), 1.4 miles away.
Status
Coming soon
Listed as coming soon. Check before you travel.
Connectors
Site information
- Operator
- Connected Kerb
- Opening hours
- Not published
- Access
- Public
- Price
- £0.53/kWh. Parking fees apply(from Open Charge Map, 31 Oct 2023)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Conyngham Hall Car Park (Connected Kerb)?
The listed price is £0.53/kWh. Parking fees apply. Prices can change, so check the price at the charger before you start.
How fast is charging at Conyngham Hall Car Park (Connected Kerb)?
Up to 7 kW AC via Type 2.
How many charging sockets does Conyngham Hall Car Park (Connected Kerb) have?
12 charging sockets: 12 × 7 kW Type 2.
Who operates Conyngham Hall Car Park?
Conyngham Hall Car Park is on the Connected Kerb network.
Where is the nearest charger with 50 kW or more to Conyngham Hall Car Park (Connected Kerb)?
St James Retail Park (Be.EV) is 1.4 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Conyngham Hall Car Park (Connected Kerb)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Conyngham Hall Car Park (Connected Kerb)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Conyngham Hall Car Park (Connected Kerb)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Chapel Street Car Park 1
- Knaresborough Wellness Centre
- Pod Point Vasstech Ltd - Knaresborough
- St James Retail Park
- Lidl-Knaresborough Road
- EG Group Harrogate LEON1
- Cheapest nearby
- Pod Point Vasstech Ltd - Knaresborough · 45.6p per kWh · 22 kW · 1.4 mi
- Fastest nearby
- St James Retail Park · 150 kW · 1.4 mi