# Gladstone Street, Crosskeys · Connected Kerb

Web page: https://ampmap.co.uk/charger/connected-kerb-gladstone-street-crosskeys-uk

Gladstone Street, Crosskeys is an EV charging site in Risca, Caerphilly County Borough, run by Connected Kerb. Both of its sockets are 7 kW Type 2, and the price is listed as £0.53/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Gladstone Street, NP11 7PA
- **Area:** Risca, Caerphilly County Borough, United Kingdom
- **Coordinates (latitude, longitude):** 51.62018, -3.12781

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** £0.53/kWh (from Open Charge Map)

## Site information

- **Operator:** Connected Kerb
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How much does it cost to charge at Gladstone Street, Crosskeys (Connected Kerb)?

The listed price is £0.53/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Gladstone Street, Crosskeys (Connected Kerb)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Gladstone Street, Crosskeys (Connected Kerb) have?

2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.

### Who operates Gladstone Street, Crosskeys?

Gladstone Street, Crosskeys is on the Connected Kerb network.

### How long does a Tesla Model Y Long Range take to charge at Gladstone Street, Crosskeys (Connected Kerb)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Gladstone Street, Crosskeys (Connected Kerb)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Gladstone Street, Crosskeys (Connected Kerb)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Risca](https://ampmap.co.uk/chargers/united-kingdom/caerphilly-county-borough/risca)
- [Connected Kerb chargers](https://ampmap.co.uk/networks/connected-kerb)

## Chargers near this site

- [Longbridge Car Park · Silverstone Green Energy](https://ampmap.co.uk/charger/silverstone-green-energy-longbridge-car-park-uk) - Type 2 22 kW · Tredegar St
- [Pod Point Cwmcarn Visitor Centre](https://ampmap.co.uk/charger/pod-point-cwmcarn-visitor-centre-uk) - Type 2 7 kW · Cwmcarn Forest Drive · From 45.6p/kWh
- [Pod Point Tesco Extra - Risca](https://ampmap.co.uk/charger/pod-point-tesco-extra-risca-uk) - CCS / CHAdeMO 50 kW, Type 2 22 kW · Pontymister Industrial Estate Newport Road · From 44.4p/kWh
- [The Crescent, Machen · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-the-crescent-machen-uk) - Type 2 22 kW · The Crescent Car Park, Machen
- [William Street, CWM · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-william-street-cwm-uk) - Type 2 7 kW · 18 William Street
- [Commercial Buildings, Cwmfelinfach Car Park · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-commercial-buildings-cwmfelinfach-car-park-uk) - Type 2 22 kW · Commerical Road, Cwmfelinfach,

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/connected-kerb-gladstone-street-crosskeys-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 10 Feb 2025).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
