# High Street, Heol-y-Cyw · Connected Kerb

Web page: https://ampmap.co.uk/charger/connected-kerb-high-street-heol-y-cyw-uk

High Street, Heol-y-Cyw is an EV charging site in Coity, Bridgend county borough, run by Connected Kerb. Both of its sockets are 22 kW Type 2.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** High Street Bridgend, CF35 6HY
- **Area:** Coity, Bridgend county borough, United Kingdom
- **Coordinates (latitude, longitude):** 51.54917, -3.52056

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 2 | Not listed |

## Site information

- **Operator:** Connected Kerb
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How fast is charging at High Street, Heol-y-Cyw (Connected Kerb)?

Up to 22 kW AC via Type 2.

### How many charging sockets does High Street, Heol-y-Cyw (Connected Kerb) have?

2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.

### Who operates High Street, Heol-y-Cyw?

High Street, Heol-y-Cyw is on the Connected Kerb network.

### How long does a Tesla Model Y Long Range take to charge at High Street, Heol-y-Cyw (Connected Kerb)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at High Street, Heol-y-Cyw (Connected Kerb)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at High Street, Heol-y-Cyw (Connected Kerb)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Coity](https://ampmap.co.uk/chargers/united-kingdom/bridgend-county-borough/coity)
- [Connected Kerb chargers](https://ampmap.co.uk/networks/connected-kerb)

## Chargers near this site

- [Pencoed Railway Station Park & Ride 1 · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-pencoed-railway-station-park-and-ride-1-uk) - Type 2 7 kW · Pencoed Railway Station Park & Ride
- [Bridgend, UK · Tesla](https://ampmap.co.uk/charger/tesla-bridgend-uk-uk) - CCS 250 kW · Bridgend Designer Outlet · From 29p/kWh
- [Rawowned Bridgend 1 · ChargePoint](https://ampmap.co.uk/charger/chargepoint-rawowned-bridgend-1-uk) - Type 2 22 kW · Wales Designer Outlet Village
- [EH - Welcome Break Sarn Park · GRIDSERVE](https://ampmap.co.uk/charger/electric-highway-welcome-break-sarn-park-services-uk) - CCS 40 kW, CHAdeMO 40 kW · M4 Jct 36 · From 92p/kWh
- [Sarn Park, UK · Tesla](https://ampmap.co.uk/charger/tesla-sarn-park-uk-uk) - CCS 250 kW, CCS / Type 2 130 kW · M4 Junction 36 · From 56p/kWh
- [Applegreen Electric Sarn Park · Applegreen Fast Charge](https://ampmap.co.uk/charger/applegreen-fast-charge-applegreen-electric-sarn-park-uk) - CCS 180 kW · Sarn Park Services

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/connected-kerb-high-street-heol-y-cyw-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 7 Dec 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
