Connected Kerb · EV charging site
Holmesdale Road
Holmesdale Road, Dorking, RH5 4HR
Holmesdale Road is an EV charging site in Dorking, Surrey, run by Connected Kerb. All 4 of its sockets are 22 kW Type 2, and the price is listed as 0.35/kWh. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Watermill (Dorking) (evyve), 1.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Connected Kerb
- Opening hours
- Not published
- Access
- Public
- Price
- 0.35/kWh(from Open Charge Map, 14 Feb 2023)
- Phone (from Open Charge Map)
- 0800 0291 696
- Getting there
- Parking restrictions may apply - check local signage.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Holmesdale Road (Connected Kerb)?
The listed price is 0.35/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Holmesdale Road (Connected Kerb)?
Up to 22 kW AC via Type 2.
How many charging sockets does Holmesdale Road (Connected Kerb) have?
4 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Holmesdale Road?
Holmesdale Road is on the Connected Kerb network. For site issues, the operator lists 0800 0291 696.
Where is the nearest charger with 50 kW or more to Holmesdale Road (Connected Kerb)?
Watermill (Dorking) (evyve) is 1.8 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Holmesdale Road (Connected Kerb)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Holmesdale Road (Connected Kerb)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Holmesdale Road (Connected Kerb)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.