Connected Kerb · EV charging site
mAlway Community Centre. Aberthaw Rise, Newport
Alway Community Centre. Aberthaw Rise, Newport, NP19 9NT
mAlway Community Centre. Aberthaw Rise, Newport is an EV charging site in Newport, run by Connected Kerb. Both of its sockets are 7 kW Type 2. 15 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Man of Gwent (Newport) (evyve), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Connected Kerb
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at mAlway Community Centre. Aberthaw Rise, Newport (Connected Kerb)?
Up to 7 kW AC via Type 2.
How many charging sockets does mAlway Community Centre. Aberthaw Rise, Newport (Connected Kerb) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates mAlway Community Centre. Aberthaw Rise, Newport?
mAlway Community Centre. Aberthaw Rise, Newport is on the Connected Kerb network.
Where is the nearest charger with 50 kW or more to mAlway Community Centre. Aberthaw Rise, Newport (Connected Kerb)?
Man of Gwent (Newport) (evyve) is 0.5 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at mAlway Community Centre. Aberthaw Rise, Newport (Connected Kerb)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at mAlway Community Centre. Aberthaw Rise, Newport (Connected Kerb)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at mAlway Community Centre. Aberthaw Rise, Newport (Connected Kerb)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Nwpt-Unix
- Nwpt-Halt
- Newport East Community Centre
- Man of Gwent (Newport)
- Hatherleigh Community Centre, Newport
- Pod Point Tesco Extra - Newport Spytty
- Cheapest nearby
- Pod Point Tesco Extra - Newport Spytty · 44.4p per kWh · 7 kW · 0.7 mi
- Fastest nearby
- Man of Gwent (Newport) · 75 kW · 0.5 mi