# Moffat Road, Ormiston · Connected Kerb

Web page: https://ampmap.co.uk/charger/connected-kerb-moffat-road-ormiston-uk

Moffat Road, Ormiston is an EV charging site in Musselburgh, East Lothian, run by Connected Kerb. It has a single 7 kW Type 2 socket.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Moffat Road, EH355JY
- **Area:** Musselburgh, East Lothian, United Kingdom
- **Coordinates (latitude, longitude):** 55.90946, -2.94780

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed |

## Site information

- **Operator:** Connected Kerb
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How fast is charging at Moffat Road, Ormiston (Connected Kerb)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Moffat Road, Ormiston (Connected Kerb) have?

1 charging socket: 1 × 7 kW Type 2.

### Who operates Moffat Road, Ormiston?

Moffat Road, Ormiston is on the Connected Kerb network.

### How long does a Tesla Model Y Long Range take to charge at Moffat Road, Ormiston (Connected Kerb)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Moffat Road, Ormiston (Connected Kerb)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Moffat Road, Ormiston (Connected Kerb)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Musselburgh](https://ampmap.co.uk/chargers/united-kingdom/east-lothian/musselburgh)
- [Connected Kerb chargers](https://ampmap.co.uk/networks/connected-kerb)

## Chargers near this site

- [Ormiston Hall](https://ampmap.co.uk/charger/ormiston-hall-uk) - Blue Commando (2P+E) 8 kW, J-1772 7 kW
- [Cinderhall Place, Elphinstone · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-cinderhall-place-elphinstone-uk) - Type 2 7 kW · Cinderhall Place
- [Pod Point Preston Hall Farms](https://ampmap.co.uk/charger/pod-point-preston-hall-farms-uk) - Type 2 7 kW · Rosemains Farm Pathhead · From 39.6p/kWh
- [Woodhall Place, Pencaitland · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-woodhall-place-pencaitland-uk) - Type 2 7 kW · Woodhall Place
- [Caponhall Road · Char.gy](https://ampmap.co.uk/charger/char-gy-caponhall-road-uk) - Type 2 7 kW · Caponhall Road
- [Loch Centre Rapid Charger · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-loch-centre-rapid-charger-loch-centre-r-uk) - CCS 50 kW, CHAdeMO 50 kW · Well Wynd

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/connected-kerb-moffat-road-ormiston-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 7 Dec 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
