Connected Kerb · EV charging site
Neale Avenue, Coventry 1
Neale Avenue, Coventry, CV5 9GF
Neale Avenue, Coventry 1 is an EV charging site in Coventry, run by Connected Kerb. Both of its sockets are 7 kW Type 2. 18 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 487-489 Holyhead Road (ESB Energy), 1.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Connected Kerb
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Neale Avenue, Coventry 1 (Connected Kerb)?
Up to 7 kW AC via Type 2.
How many charging sockets does Neale Avenue, Coventry 1 (Connected Kerb) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Neale Avenue, Coventry 1?
Neale Avenue, Coventry 1 is on the Connected Kerb network.
Where is the nearest charger with 50 kW or more to Neale Avenue, Coventry 1 (Connected Kerb)?
487-489 Holyhead Road (ESB Energy) is 1.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Neale Avenue, Coventry 1 (Connected Kerb)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Neale Avenue, Coventry 1 (Connected Kerb)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Neale Avenue, Coventry 1 (Connected Kerb)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.