Connected Kerb · EV charging site
Queen Street Car Park, Frogmore Road 1
Frogmore Road, Nantwich, TF9 1PX
Queen Street Car Park, Frogmore Road 1 is an EV charging site in Nantwich, Cheshire East, run by Connected Kerb. Both of its sockets are 7 kW Type 2. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Instavolt - McDonald's Market Drayton (InstaVolt Ltd), 1.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Connected Kerb
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Queen Street Car Park, Frogmore Road 1 (Connected Kerb)?
Up to 7 kW AC via Type 2.
How many charging sockets does Queen Street Car Park, Frogmore Road 1 (Connected Kerb) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Queen Street Car Park, Frogmore Road 1?
Queen Street Car Park, Frogmore Road 1 is on the Connected Kerb network.
Where is the nearest charger with 50 kW or more to Queen Street Car Park, Frogmore Road 1 (Connected Kerb)?
Instavolt - McDonald's Market Drayton (InstaVolt Ltd) is 1.5 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Queen Street Car Park, Frogmore Road 1 (Connected Kerb)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Queen Street Car Park, Frogmore Road 1 (Connected Kerb)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Queen Street Car Park, Frogmore Road 1 (Connected Kerb)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Instavolt - McDonald's Market Drayton · 120 kW · 1.5 mi