Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Connected Kerb · EV charging site

Woolgate Car Park

Market Square, Witney, OX28 4WX

Woolgate Car Park is an EV charging site in Witney, Oxfordshire, run by Connected Kerb. Its 12 sockets reach up to 75 kW, with CCS at the top speed. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Shell Recharge Shell Little Waitrose Ducklington, 1 mile away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 9 Sept 2024Last verified 9 Sept 2024

Connectors

CCS · 75 kW4 connectors
Type 2 · 6 kW8 connectors

Site information

Opening hours
Not published
Access
Public
Price
AC: £0.48/kWh; DC: £0.67/kWh(from Open Charge Map, 9 Sept 2024)
Notes
DC chargers are fitted with Contactless payment terminals. AC chargepoints will require RFID, App or QR code scan

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 75 kW CCS~47 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 75 kW CCS~35 min
Audi Q4 e-tron 50 10–80% · 75 kW CCS~49 min
Hyundai IONIQ 5 10–80% · 75 kW CCS~43 min
MG Motor MG4 Trophy 10–80% · 75 kW CCS~40 min
Hyundai Kona Electric Long Range 10–80% · 75 kW CCS~43 min
Nissan LEAF 10–80% · 6 kW Type 2~4h 40m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Woolgate Car Park (Connected Kerb)?

The listed price is AC: £0.48/kWh; DC: £0.67/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Woolgate Car Park (Connected Kerb)?

Up to 75 kW DC via Type 2, CCS.

How many charging sockets does Woolgate Car Park (Connected Kerb) have?

12 charging sockets: 1 × 6 kW Type 2, 1 × 6 kW Type 2, 1 × 6 kW Type 2, 1 × 6 kW Type 2, 1 × 6 kW Type 2, 1 × 6 kW Type 2, 1 × 6 kW Type 2, 1 × 6 kW Type 2, 1 × 75 kW CCS, 1 × 75 kW CCS, 1 × 75 kW CCS, 1 × 75 kW CCS.

Who operates Woolgate Car Park?

Woolgate Car Park is on the Connected Kerb network.

Where is the nearest other charger with 50 kW or more to Woolgate Car Park (Connected Kerb)?

Shell Recharge Shell Little Waitrose Ducklington is 1 mile away in a straight line, with up to 300 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Woolgate Car Park (Connected Kerb)?

A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Woolgate Car Park (Connected Kerb)?

A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Woolgate Car Park (Connected Kerb)?

A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 9 Sept 2024

Amp Map does not take payment. You pay the operator.