# Woolgate Car Park · Connected Kerb

Web page: https://ampmap.co.uk/charger/connected-kerb-woolgate-car-park-uk

Woolgate Car Park is an EV charging site in Witney, Oxfordshire, run by Connected Kerb. Its 12 sockets reach up to 75 kW, with CCS at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Market Square, OX28 4WX
- **Area:** Witney, Oxfordshire, United Kingdom
- **Coordinates (latitude, longitude):** 51.78699, -1.48249

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 75 kW | 4 | Not listed |
| Type 2 | 6 kW | 8 | Not listed |

- **Price:** AC: £0.48/kWh; DC: £0.67/kWh (from Open Charge Map)

## Site information

- **Operator:** Connected Kerb
- **Opening hours:** Not published
- **Access:** Public
- **Notes:** DC chargers are fitted with Contactless payment terminals. AC chargepoints will require RFID, App or QR code scan

## Common questions

### How much does it cost to charge at Woolgate Car Park (Connected Kerb)?

The listed price is AC: £0.48/kWh; DC: £0.67/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Woolgate Car Park (Connected Kerb)?

Up to 75 kW DC via Type 2, CCS.

### How many charging sockets does Woolgate Car Park (Connected Kerb) have?

12 charging sockets: 1 × 6 kW Type 2, 1 × 6 kW Type 2, 1 × 6 kW Type 2, 1 × 6 kW Type 2, 1 × 6 kW Type 2, 1 × 6 kW Type 2, 1 × 6 kW Type 2, 1 × 6 kW Type 2, 1 × 75 kW CCS, 1 × 75 kW CCS, 1 × 75 kW CCS, 1 × 75 kW CCS.

### Who operates Woolgate Car Park?

Woolgate Car Park is on the Connected Kerb network.

### How long does a Tesla Model Y Long Range take to charge at Woolgate Car Park (Connected Kerb)?

A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Woolgate Car Park (Connected Kerb)?

A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Woolgate Car Park (Connected Kerb)?

A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Witney](https://ampmap.co.uk/chargers/united-kingdom/oxfordshire/witney)
- [Connected Kerb chargers](https://ampmap.co.uk/networks/connected-kerb)

## Chargers near this site

- [Dark Lane · EZ-Charge](https://ampmap.co.uk/charger/ez-charge-dark-lane-uk) - Type 2 22 kW · Dark Lane
- [Shell Recharge Shell Little Waitrose Ducklington](https://ampmap.co.uk/charger/shell-recharge-shell-little-waitrose-ducklington-uk) - CCS 300 kW, CHAdeMO 63 kW · Ducklington Lane · From 89p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/connected-kerb-woolgate-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 9 Sept 2024).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
