EV charging site
County Renault Barnstaple
Coney Avenue, Barnstaple, EX32 8QJ
County Renault Barnstaple is an EV charging site in Barnstaple, Devon. Its 2 sockets reach up to 22 kW, with Type 2 at the top speed, and the price is listed as Free for eligible users. 7 other charging sites are listed within a mile, and the nearest site with 50 kW or more is McDonald's Barnstaple (InstaVolt Ltd), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Private · notice required
- Price
- Free for eligible users(from Open Charge Map, 3 Sept 2014)
- Phone (from Open Charge Map)
- 01271 349500
- Notes
- Free for eligible users
- Getting there
- IMPORTANT INFO: THIS POINT HAS RESTRICTED ACCESS RING AHEAD PRIOR TO ARRIVAL
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at County Renault Barnstaple?
The listed price is Free for eligible users. Prices can change, so check the price at the charger before you start.
How fast is charging at County Renault Barnstaple?
Up to 22 kW AC via Type 2.
How many charging sockets does County Renault Barnstaple have?
2 charging sockets: 1 × 3 kW Type 2, 1 × 22 kW Type 2.
Can anyone charge at County Renault Barnstaple?
The operator lists this charger as private - access is restricted.
Where is the nearest charger with 50 kW or more to County Renault Barnstaple?
McDonald's Barnstaple (InstaVolt Ltd) is 0.1 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at County Renault Barnstaple?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at County Renault Barnstaple?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at County Renault Barnstaple?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- McDonald's Barnstaple
- Esso Garage Barnstaple
- Pod Point Tesco Superstore - Barnstaple
- Belle Meadow Car Park, Barnstaple
- Pod Point Tesco Extra - Barnstaple Taw View
- Barnstaple Central Car Park, Barnstaple
- Cheapest nearby
- Pod Point Tesco Superstore - Barnstaple · 44.4p per kWh · 7 kW · 0.3 mi
- Fastest nearby
- Barnstaple Central Car Park, Barnstaple · 300 kW · 0.7 mi