D G Weaver Ltd · EV charging site
D G Weaver Ltd
Talbot Road,Talbot Green, Pontypridd, CF72 8AF
D G Weaver Ltd is an EV charging site in Pontypridd, Rhondda Cynon Taf, run by D G Weaver Ltd and open 24 hours a day. Both of its sockets are 25 kW CHAdeMO and CCS. Amp Map measured 100% uptime here over the last 30 days. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Glamorgan Vale Retail Park, Pontyclun (Osprey Charging), 0.4 miles away.
Status
2 of 2 available
Checking status…
Connectors
CCS · 25 kW
CHAdeMO · 25 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- D G Weaver Ltd
- Opening hours
- Open 24 hours
- Payment
- In the operator's appRFID card
- Charger ID
- UKEV10754-1
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at D G Weaver Ltd?
Up to 25 kW DC via CHAdeMO, CCS.
How many charging sockets does D G Weaver Ltd have?
2 charging sockets: 1 × 25 kW CHAdeMO, 1 × 25 kW CCS. Live per-socket availability is shown on this page.
Is D G Weaver Ltd open 24/7?
Yes - D G Weaver Ltd is open 24 hours a day, 7 days a week.
How reliable is D G Weaver Ltd?
Amp Map measured 100% uptime here from recorded live status over the last 30 days.
Who operates D G Weaver Ltd?
D G Weaver Ltd is on the D G Weaver Ltd network.
Where is the nearest charger with 50 kW or more to D G Weaver Ltd?
Glamorgan Vale Retail Park, Pontyclun (Osprey Charging) is 0.4 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at D G Weaver Ltd?
A typical 10–80% rapid charge takes about 2h 20m on the 25 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at D G Weaver Ltd?
A typical 10–80% rapid charge takes about 1h 41m on the 25 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at D G Weaver Ltd?
A typical 10–80% rapid charge takes about 2h 9m on the 25 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Talbot Green Community Centre
- Pod Point Tesco Extra - Pontyclun Talbot Green
- Glamorgan Vale Retail Park, Pontyclun
- Llantrisant Leisure Centre
- Heol y Sarn, Llantrisant
- Heol Yr Osaf (Lease), Rhondda Cynon Taf
- Cheapest nearby
- Pod Point Tesco Extra - Pontyclun Talbot Green · 44.4p per kWh · 7 kW · 0.3 mi
- Fastest nearby
- Glamorgan Vale Retail Park, Pontyclun · 150 kW · 0.4 mi