# D G Weaver Ltd

Web page: https://ampmap.co.uk/charger/d-g-weaver-ltd-uk

D G Weaver Ltd is an EV charging site in Pontypridd, Rhondda Cynon Taf, run by D G Weaver Ltd and open 24 hours a day. Both of its sockets are 25 kW CHAdeMO and CCS. Amp Map measured 100% uptime here over the last 30 days.

## Status

2 of 2 open at 22 Nov 2026, 16:28 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Talbot Road,Talbot Green, CF72 8AF
- **Area:** Pontypridd, Rhondda Cynon Taf, United Kingdom
- **Coordinates (latitude, longitude):** 51.53689, -3.38444

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 25 kW | 1 | Not listed | 1 free |
| CHAdeMO | 25 kW | 1 | Not listed | 1 free |

## Site information

- **Operator:** D G Weaver Ltd
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at D G Weaver Ltd?

Up to 25 kW DC via CHAdeMO, CCS.

### How many charging sockets does D G Weaver Ltd have?

2 charging sockets: 1 × 25 kW CHAdeMO, 1 × 25 kW CCS. Live per-socket availability is shown on this page.

### Is D G Weaver Ltd open 24/7?

Yes - D G Weaver Ltd is open 24 hours a day, 7 days a week.

### How reliable is D G Weaver Ltd?

Amp Map measured 100% uptime here from recorded live status over the last 30 days.

### Who operates D G Weaver Ltd?

D G Weaver Ltd is on the D G Weaver Ltd network.

### How long does a Tesla Model Y Long Range take to charge at D G Weaver Ltd?

A typical 10–80% rapid charge takes about 2h 20m on the 25 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at D G Weaver Ltd?

A typical 10–80% rapid charge takes about 1h 41m on the 25 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at D G Weaver Ltd?

A typical 10–80% rapid charge takes about 2h 9m on the 25 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Pontypridd](https://ampmap.co.uk/chargers/united-kingdom/rhondda-cynon-taf/pontypridd)

## Chargers near this site

- [Talbot Green Community Centre · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-talbot-green-community-centre-uk) - Type 2 22 kW · Talbot Green Community Centre
- [Pod Point Tesco Extra - Pontyclun Talbot Green](https://ampmap.co.uk/charger/pod-point-tesco-extra-pontyclun-talbot-green-uk) - Type 2 7 kW · Green Park Talbot Green · From 44.4p/kWh
- [Glamorgan Vale Retail Park, Pontyclun · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-glamorgan-vale-retail-park-pontyclun-uk) - CCS 150 kW · Talbot Green · From 89p/kWh
- [Llantrisant Leisure Centre · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-llantrisant-leisure-centre-uk) - Type 2 22 kW · Llantrisant Leisure Centre
- [Heol y Sarn, Llantrisant · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-heol-y-sarn-llantrisant-uk) - Type 2 22 kW · Heol y Sarn Car Park
- [Heol Yr Osaf (Lease), Rhondda Cynon Taf · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-heol-yr-osaf-lease-rhondda-cynon-taf-uk) - Type 2 7 kW · Heol Yr Osaf, Syphon Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/d-g-weaver-ltd-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: D G Weaver Ltd (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
