# DAERA Portal Control

Web page: https://ampmap.co.uk/charger/daera-portal-control-uk

DAERA Portal Control is an EV charging site in Newry, Newry Mourne and Down, run by DAERA Portal Control and open 24 hours a day. All 4 of its sockets are 7 kW Type 2. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 16 charging sessions here over the last 30 days.

## Status

4 of 4 open at 22 Nov 2026, 13:05 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** 58 Newry Rd, BT34 3LH
- **Area:** Newry, Newry Mourne and Down, United Kingdom
- **Coordinates (latitude, longitude):** 54.10321, -6.25862

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 7 kW | 4 | Not listed | 4 free |

## Site information

- **Operator:** DAERA Portal Control
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at DAERA Portal Control?

Up to 7 kW AC via Type 2.

### How many charging sockets does DAERA Portal Control have?

4 charging sockets: 4 × 7 kW Type 2. Live per-socket availability is shown on this page.

### Is DAERA Portal Control open 24/7?

Yes - DAERA Portal Control is open 24 hours a day, 7 days a week.

### When is DAERA Portal Control busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 9 pm. The live status on this page shows what is free before you set off.

### How reliable is DAERA Portal Control?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 16 observed charging sessions.

### Who operates DAERA Portal Control?

DAERA Portal Control is on the DAERA Portal Control network.

### How long does a Tesla Model Y Long Range take to charge at DAERA Portal Control?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at DAERA Portal Control?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at DAERA Portal Control?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Newry](https://ampmap.co.uk/chargers/united-kingdom/newry-mourne-and-down/newry)
- [DAERA Portal Control chargers](https://ampmap.co.uk/networks/daera-portal-control)

## Chargers near this site

- [Havelock Place, Warrenpoint · ESB Ecars](https://ampmap.co.uk/charger/esb-ecars-havelock-place-warrenpoint-uk) - Type 2 22 kW · Havelock Place
- [Kellys group](https://ampmap.co.uk/charger/monta-aps-kellys-group-a-uk) - Type 2 22 kW · Milltown East Industrial Estate

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/daera-portal-control-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: DAERA Portal Control (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
