Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Darta · EV charging site

Darta

Sandhill, Beverley, YO25 9DR

Darta is an EV charging site in Beverley, East Riding of Yorkshire, run by Darta and open 24 hours a day. It has a single 7 kW Type 2 socket. Recorded live status shows it is usually busiest around 10 am, and Amp Map measured 100% uptime and recorded 20 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Lidl-Mill Street, 2.4 miles away.

Status

1 of 1 available

Checking status…

VerifiedLive status and details from Darta’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 7 kW1 connector1 free
DLG44602-1100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Darta
Opening hours
Open 24 hours
Payment
In the operator's appRFID card
Charger ID
DLG44602-1

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Darta?

Up to 7 kW AC via Type 2.

How many charging sockets does Darta have?

1 charging socket: 1 × 7 kW Type 2. Live per-socket availability is shown on this page.

Is Darta open 24/7?

Yes - Darta is open 24 hours a day, 7 days a week.

When is Darta busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Darta?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 20 observed charging sessions.

Who operates Darta?

Darta is on the Darta network.

Where is the nearest charger with 50 kW or more to Darta?

Lidl-Mill Street is 2.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Darta?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Darta?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Darta?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Darta · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.