Darta · EV charging site
Darta
Sandhill, Beverley, YO25 9DR
Darta is an EV charging site in Beverley, East Riding of Yorkshire, run by Darta and open 24 hours a day. It has a single 7 kW Type 2 socket. Recorded live status shows it is usually busiest around 10 am, and Amp Map measured 100% uptime and recorded 20 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Lidl-Mill Street, 2.4 miles away.
Status
1 of 1 available
Checking status…
Connectors
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Darta
- Opening hours
- Open 24 hours
- Payment
- In the operator's appRFID card
- Charger ID
- DLG44602-1
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Darta?
Up to 7 kW AC via Type 2.
How many charging sockets does Darta have?
1 charging socket: 1 × 7 kW Type 2. Live per-socket availability is shown on this page.
Is Darta open 24/7?
Yes - Darta is open 24 hours a day, 7 days a week.
When is Darta busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Darta?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 20 observed charging sessions.
Who operates Darta?
Darta is on the Darta network.
Where is the nearest charger with 50 kW or more to Darta?
Lidl-Mill Street is 2.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Darta?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Darta?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Darta?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Lidl-Mill Street
- Pod Point Cross Hill Car Park
- Pod Point Tesco Superstore - Driffield
- East Riding Leisure Driffield (Main Car Park)
- East Riding Leisure Driffield Rear Car Park
- Cheapest nearby
- Pod Point Tesco Superstore - Driffield · 44.4p per kWh · 7 kW · 2.5 mi
- Fastest nearby
- Lidl-Mill Street · 50 kW · 2.4 mi