# Darta

Web page: https://ampmap.co.uk/charger/darta-uk

Darta is an EV charging site in Beverley, East Riding of Yorkshire, run by Darta and open 24 hours a day. It has a single 7 kW Type 2 socket. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 100% uptime and recorded 18 charging sessions here over the last 30 days.

## Status

1 of 1 open at 22 Nov 2026, 12:40 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Sandhill, YO25 9DR
- **Area:** Beverley, East Riding of Yorkshire, United Kingdom
- **Coordinates (latitude, longitude):** 53.99339, -0.49704

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed | 1 free |

## Site information

- **Operator:** Darta
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at Darta?

Up to 7 kW AC via Type 2.

### How many charging sockets does Darta have?

1 charging socket: 1 × 7 kW Type 2. Live per-socket availability is shown on this page.

### Is Darta open 24/7?

Yes - Darta is open 24 hours a day, 7 days a week.

### When is Darta busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is Darta?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 18 observed charging sessions.

### Who operates Darta?

Darta is on the Darta network.

### How long does a Tesla Model Y Long Range take to charge at Darta?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Darta?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Darta?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Beverley](https://ampmap.co.uk/chargers/united-kingdom/east-riding-of-yorkshire/beverley)

## Chargers near this site

- [Lidl-Mill Street](https://ampmap.co.uk/charger/lidl-mill-street-uk) - CCS 50 kW, CHAdeMO 50 kW · Mill Street
- [Pod Point Cross Hill Car Park](https://ampmap.co.uk/charger/pod-point-cross-hill-car-park-uk) - Type 2 7 kW · 4 Cross Hill Driffield · From 48p/kWh
- [Pod Point Tesco Superstore - Driffield](https://ampmap.co.uk/charger/pod-point-tesco-superstore-driffield-uk) - Type 2 7 kW · George Street · From 44.4p/kWh
- [East Riding Leisure Driffield (Main Car Park) · EVBox](https://ampmap.co.uk/charger/evbox-east-riding-leisure-driffield-main-car-park-uk) - Type 2 7 kW · Bridlington Road
- [East Riding Leisure Driffield Rear Car Park · EVBox](https://ampmap.co.uk/charger/evbox-east-riding-leisure-driffield-rear-car-park-uk) - Type 2 7 kW · Bridlington Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/darta-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Darta (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
