Deepcut · EV charging site
Deepcut
St Barbaras church, Deepcut Bridge Road, Farnborough, GU16 6QP
Deepcut is an EV charging site in Farnborough, Hampshire, run by Deepcut and open 24 hours a day. All 7 of its sockets are 7 kW Type 2. Recorded live status shows it is usually busiest around 9 pm, and Amp Map measured 100% uptime and recorded 18 charging sessions here over the last 30 days. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Mytchett SF Connect (BP Pulse), 1.6 miles away.
Status
5 of 7 available
Checking status…
Connectors
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Deepcut
- Opening hours
- Open 24 hours
- Payment
- In the operator's appRFID card
- Charger ID
- ROLEC_DME51229-1
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Deepcut?
Up to 7 kW AC via Type 2.
How many charging sockets does Deepcut have?
7 charging sockets: 7 × 7 kW Type 2. Live per-socket availability is shown on this page.
Is Deepcut open 24/7?
Yes - Deepcut is open 24 hours a day, 7 days a week.
When is Deepcut busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 9 pm and quietest around 11 am. The live status on this page shows what is free before you set off.
How reliable is Deepcut?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 18 observed charging sessions.
Who operates Deepcut?
Deepcut is on the Deepcut network.
Where is the nearest charger with 50 kW or more to Deepcut?
Mytchett SF Connect (BP Pulse) is 1.6 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Deepcut?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Deepcut?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Deepcut?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- The Frog
- Pod Point Cedar Lodge Nursing Home
- Mytchett SF Connect
- Toby Carvery - Frimley [16390]
- Pod Point Farnborough Blackwater Shopping Park (The Mary Street Estate Limited)
- Meads Shopping Centre, Ground Floor, Farnborough
- Cheapest nearby
- Pod Point Cedar Lodge Nursing Home · 39.6p per kWh · 22 kW · 0.7 mi
- Fastest nearby
- Mytchett SF Connect · 300 kW · 1.6 mi