Diamond Farm · EV charging site
Diamond Farm
Weston-super-Mare, TA8 2RL
Diamond Farm is an EV charging site in Weston-super-Mare, North Somerset, run by Diamond Farm and open 24 hours a day. It has a single 22 kW Type 2 socket. Recorded live status shows it is usually busiest around 8 am. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Weston-Super-Mare, Weston Retail Park (Source EV), 3.2 miles away.
Status
Not reporting
Checking status…
Connectors
Type 2 · 22 kW
Site information
- Operator
- Diamond Farm
- Opening hours
- Open 24 hours
- Payment
- In the operator's appRFID card
- Charger ID
- UKEV16332-1
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Diamond Farm?
Up to 22 kW AC via Type 2.
How many charging sockets does Diamond Farm have?
1 charging socket: 1 × 22 kW Type 2. Live per-socket availability is shown on this page.
Is Diamond Farm open 24/7?
Yes - Diamond Farm is open 24 hours a day, 7 days a week.
When is Diamond Farm busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 8 am and quietest around 1 pm. The live status on this page shows what is free before you set off.
Who operates Diamond Farm?
Diamond Farm is on the Diamond Farm network.
Where is the nearest charger with 50 kW or more to Diamond Farm?
Weston-Super-Mare, Weston Retail Park (Source EV) is 3.2 miles away in a straight line, with up to 160 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Diamond Farm?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Diamond Farm?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Diamond Farm?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Brean Leisure Park
- Weston-Super-Mare, Weston Retail Park
- Carlton Street Car Park
- Tim Hortons
- Howards Weston Super Mare
- Howards Toyota
- Cheapest nearby
- Pod Point Brean Leisure Park · 49.2p per kWh · 3 kW · 1.1 mi
- Fastest nearby
- Weston-Super-Mare, Weston Retail Park · 160 kW · 3.2 mi