# Doubletree by Hilton Westerwood

Web page: https://ampmap.co.uk/charger/doubletree-by-hilton-westerwood-uk

Doubletree by Hilton Westerwood is an EV charging site in Cumbernauld, North Lanarkshire. Its 4 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 1 St Andrews Drive, G68 0EW
- **Area:** Cumbernauld, North Lanarkshire, United Kingdom
- **Coordinates (latitude, longitude):** 55.96885, -3.97872

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How much does it cost to charge at Doubletree by Hilton Westerwood?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Doubletree by Hilton Westerwood?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

### How many charging sockets does Doubletree by Hilton Westerwood have?

4 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 2 × 7 kW Type 2.

### How long does a Tesla Model Y Long Range take to charge at Doubletree by Hilton Westerwood?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Doubletree by Hilton Westerwood?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Doubletree by Hilton Westerwood?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Cumbernauld](https://ampmap.co.uk/chargers/united-kingdom/north-lanarkshire/cumbernauld)

## Chargers near this site

- [Power Networks Demonstration Centre, Wardpark · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-power-networks-demonstration-centre-wardpark-uk) - CCS 50 kW, CHAdeMO 50 kW · 62 Napier Road
- [Bron Way Car Park · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-bron-way-car-park-uk) - Type 2 7 kW · Bron Way
- [Antonine Shopping Centre - 0115 · FOR EV](https://ampmap.co.uk/charger/for-ev-antonine-shopping-centre-0115-uk) - CCS 50 kW, Type 2 22 kW · Antonine Shopping Centre, Tryst Road · From 65p/kWh
- [Arnold Clark Cumbernauld Kia · Arnold Clark Dealer Network](https://ampmap.co.uk/charger/arnold-clark-cumbernauld-kia-uk) - CCS 150 kW, CHAdeMO 50 kW · South Carbrain Ring Road
- [S Carbrain Road · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-s-carbrain-road-uk) - Type 2 22 kW · Cumbernauld
- [Ravenswood Pitches · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-ravenswood-pitches-uk) - CCS 50 kW, CHAdeMO 50 kW · Dowanfield Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/doubletree-by-hilton-westerwood-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 8 Jul 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
