# Little Haven PCNP public car park · Dragon Charging

Web page: https://ampmap.co.uk/charger/dragon-charging-little-haven-pcnp-public-car-park-uk

Little Haven PCNP public car park is an EV charging site in Herbrandston, Pembrokeshire, run by Dragon Charging. All 4 of its sockets are 22 kW Type 2, and the price is listed as £0.65/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** St. Brides Road, SA62 3UN
- **Area:** Herbrandston, Pembrokeshire, United Kingdom
- **Coordinates (latitude, longitude):** 51.77308, -5.10766

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 4 | Not listed |

- **Price:** £0.65/kWh (from Open Charge Map)

## Site information

- **Operator:** Dragon Charging
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How much does it cost to charge at Little Haven PCNP public car park (Dragon Charging)?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Little Haven PCNP public car park (Dragon Charging)?

Up to 22 kW AC via Type 2.

### How many charging sockets does Little Haven PCNP public car park (Dragon Charging) have?

4 charging sockets: 2 × 22 kW Type 2, 2 × 22 kW Type 2.

### Who operates Little Haven PCNP public car park?

Little Haven PCNP public car park is on the Dragon Charging network.

### How long does a Tesla Model Y Long Range take to charge at Little Haven PCNP public car park (Dragon Charging)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Little Haven PCNP public car park (Dragon Charging)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Little Haven PCNP public car park (Dragon Charging)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Herbrandston](https://ampmap.co.uk/chargers/united-kingdom/pembrokeshire/herbrandston)
- [Dragon Charging chargers](https://ampmap.co.uk/networks/dragon-charging)

## Chargers near this site

- [Millmoor Way Car Park, Broad Haven · Dragon Charging](https://ampmap.co.uk/charger/dragon-charging-millmoor-way-car-park-broad-haven-uk) - Type 2 22 kW · Millmoor Way
- [Pod Point Walwyns Castle](https://ampmap.co.uk/charger/pod-point-walwyns-castle-uk) - Type 2 7 kW · Village Hall Walwyns Castle · From 34.8p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/dragon-charging-little-haven-pcnp-public-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 29 May 2022).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
