Dragon Charging · EV charging site
Newgale Car Park PCNP
Newgale Beach, Camrose
Newgale Car Park PCNP is an EV charging site in Camrose, Pembrokeshire, run by Dragon Charging. All 4 of its sockets are 22 kW Type 2, and the price is listed as £0.65/kWh. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Ffordd Angor / Anchor Drive (Dragon Charging), 6.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Dragon Charging
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.65/kWh(from Open Charge Map, 29 May 2022)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Newgale Car Park PCNP (Dragon Charging)?
The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Newgale Car Park PCNP (Dragon Charging)?
Up to 22 kW AC via Type 2.
How many charging sockets does Newgale Car Park PCNP (Dragon Charging) have?
4 charging sockets: 2 × 22 kW Type 2, 2 × 22 kW Type 2.
Who operates Newgale Car Park PCNP?
Newgale Car Park PCNP is on the Dragon Charging network.
Where is the nearest charger with 50 kW or more to Newgale Car Park PCNP (Dragon Charging)?
Ffordd Angor / Anchor Drive (Dragon Charging) is 6.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Newgale Car Park PCNP (Dragon Charging)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Newgale Car Park PCNP (Dragon Charging)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Newgale Car Park PCNP (Dragon Charging)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.