Dragon Charging · EV charging site
Rhodfa Padarn
Canolfan Rheidol, Aberystwyth, SY23 3UR
Rhodfa Padarn is an EV charging site in Aberystwyth, County of Ceredigion, run by Dragon Charging. Both of its sockets are 22 kW Type 2, and the price is listed as £0.35/kWh. 13 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Morrisons Aberystwyth (GeniePoint), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Dragon Charging
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.35/kWh(from Open Charge Map, 30 May 2022)
- Notes
- Scan QR code
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Rhodfa Padarn (Dragon Charging)?
The listed price is £0.35/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Rhodfa Padarn (Dragon Charging)?
Up to 22 kW AC via Type 2.
How many charging sockets does Rhodfa Padarn (Dragon Charging) have?
2 charging sockets: 2 × 22 kW Type 2.
Who operates Rhodfa Padarn?
Rhodfa Padarn is on the Dragon Charging network.
Where is the nearest charger with 50 kW or more to Rhodfa Padarn (Dragon Charging)?
Morrisons Aberystwyth (GeniePoint) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Rhodfa Padarn (Dragon Charging)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Rhodfa Padarn (Dragon Charging)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Rhodfa Padarn (Dragon Charging)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Welsh Government
- Plascrug Leisure Centre, Aberystwyth
- Morrisons Aberystwyth
- Morrisons Aberystwyth Parc Y Llyn
- Anthony Motors Ltd
- Aberystwyth, UK
- Cheapest nearby
- Aberystwyth, UK · 26p per kWh · 250 kW · 0.3 mi
- Fastest nearby
- Aberystwyth, UK · 250 kW · 0.3 mi