E.ON Drive · EV charging site
Railway View Car Park
View Avenue, Burnley, BB7 2RA
Railway View Car Park is an EV charging site in Burnley, Lancashire, run by E.ON Drive. It has a single socket, with Type 2 at up to 11 kW, and the price is listed as Payment Required 21p/kWh. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is King Street Whalley (BP Pulse), 3.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- E.ON Drive
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Payment Required 21p/kWh(from Open Charge Map, 2 Feb 2021)
- Phone (from Open Charge Map)
- +44 1623 707014
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Railway View Car Park (E.ON Drive)?
The listed price is Payment Required 21p/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Railway View Car Park (E.ON Drive)?
Up to 11 kW AC via Type 2.
How many charging sockets does Railway View Car Park (E.ON Drive) have?
1 charging socket: 2 × 11 kW Type 2, 2 × 11 kW Type 2.
Who operates Railway View Car Park?
Railway View Car Park is on the E.ON Drive network. For site issues, the operator lists +44 1623 707014.
Where is the nearest charger with 50 kW or more to Railway View Car Park (E.ON Drive)?
King Street Whalley (BP Pulse) is 3.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Railway View Car Park (E.ON Drive)?
A 10–80% charge takes about 5h 2m on the 11 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Railway View Car Park (E.ON Drive)?
A 10–80% charge takes about 3h 38m on the 11 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Railway View Car Park (E.ON Drive)?
A 10–80% charge takes about 4h 39m on the 11 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- York Street Clitheroe
- Chester Avenue Car Park
- Ribble Valley 6831-2
- Pod Point Tesco Superstore - Clitheroe
- Cheapest nearby
- Pod Point Tesco Superstore - Clitheroe · 44.4p per kWh · 7 kW · 0.2 mi