# Headington Car Park 4 · EB Charging

Web page: https://ampmap.co.uk/charger/eb-charging-headington-car-park-4-uk

Headington Car Park 4 is an EV charging site in Oxford, Oxfordshire, run by EB Charging. Its 7 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed, and the price is listed as £0.79/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Old High Street, OX3 9HN
- **Area:** Oxford, Oxfordshire, United Kingdom
- **Coordinates (latitude, longitude):** 51.76145, -1.21081

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 22 kW | 1 | Not listed |
| Type 2 | 7 kW | 6 | Not listed |

- **Price:** £0.79/kWh (from Open Charge Map)

## Site information

- **Operator:** EB Charging
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required
- **Notes:** Not fitted with payment terminals. Bespoke app or RFID needed

## Common questions

### How much does it cost to charge at Headington Car Park 4 (EB Charging)?

The listed price is £0.79/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Headington Car Park 4 (EB Charging)?

Up to 50 kW DC via CHAdeMO, CCS, Type 2.

### How many charging sockets does Headington Car Park 4 (EB Charging) have?

7 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 22 kW Type 2, 2 × 7 kW Type 2, 2 × 7 kW Type 2, 2 × 7 kW Type 2.

### Who operates Headington Car Park 4?

Headington Car Park 4 is on the EB Charging network. For site issues, the operator lists +44 1727 807 263.

### How long does a Tesla Model Y Long Range take to charge at Headington Car Park 4 (EB Charging)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Headington Car Park 4 (EB Charging)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Headington Car Park 4 (EB Charging)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Oxford](https://ampmap.co.uk/chargers/united-kingdom/oxfordshire/oxford)
- [Cheapest charging in Oxford](https://ampmap.co.uk/chargers/united-kingdom/oxfordshire/oxford/cheapest)
- [EB Charging chargers](https://ampmap.co.uk/networks/eb-charging)

## Chargers near this site

- [White Horse (Headington) · evyve](https://ampmap.co.uk/charger/evyve-white-horse-headington-uk) - CCS 120 kW · London Rd · From 85p/kWh
- [Stapleton Road](https://ampmap.co.uk/charger/stapleton-road-uk) - Type 2 4 kW
- [Oxford Brookes University Headington Campus · Chargemaster](https://ampmap.co.uk/charger/chargemaster-oxford-brookes-university-headington-campus-uk) - Type 2 7 kW, BS1363 3 Pin 13 Amp 3 kW · Headington Road
- [Manzil Way · Blink Charging](https://ampmap.co.uk/charger/blink-charging-manzil-way-uk) - CCS 50 kW, CHAdeMO 50 kW · Manzil Way
- [OCCZ001](https://ampmap.co.uk/charger/occz001-uk) - Type 2 7 kW · Bedford Street
- [BMW Cowley](https://ampmap.co.uk/charger/bmw-cowley-uk) - CCS 50 kW, Type 2 22 kW · Horspath Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/eb-charging-headington-car-park-4-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 23 Mar 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
