# Montpelier Crescent (post 6) · EB Charging

Web page: https://ampmap.co.uk/charger/eb-charging-montpelier-crescent-post-6-uk

Montpelier Crescent (post 6) is an EV charging site in Brighton, Brighton and Hove, run by EB Charging. It has a single 4 kW Type 2 socket, and the price is listed as £0.26/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 12 Montpelier Crescent, BN1 3JF
- **Area:** Brighton, Brighton and Hove, United Kingdom
- **Coordinates (latitude, longitude):** 50.82922, -0.14883
- **Getting there:** Lamp post charger with exclusive bay for electric vehicles.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 4 kW | 1 | Not listed |

- **Price:** £0.26/kWh (from Open Charge Map)

## Site information

- **Operator:** EB Charging
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Montpelier Crescent (post 6) (EB Charging)?

The listed price is £0.26/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Montpelier Crescent (post 6) (EB Charging)?

Up to 4 kW AC via Type 2.

### How many charging sockets does Montpelier Crescent (post 6) (EB Charging) have?

1 charging socket: 1 × 4 kW Type 2.

### Who operates Montpelier Crescent (post 6)?

Montpelier Crescent (post 6) is on the EB Charging network. For site issues, the operator lists +44 1727 807 263.

### How long does a Tesla Model Y Long Range take to charge at Montpelier Crescent (post 6) (EB Charging)?

A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Montpelier Crescent (post 6) (EB Charging)?

A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Montpelier Crescent (post 6) (EB Charging)?

A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Brighton](https://ampmap.co.uk/chargers/united-kingdom/brighton-and-hove/brighton)
- [EB Charging chargers](https://ampmap.co.uk/networks/eb-charging)

## Chargers near this site

- [Clifton Road, Lamp Column 2 · Blink Charging](https://ampmap.co.uk/charger/blink-charging-clifton-road-lamp-column-2-uk) - Type 2 4 kW · Lamp Column 2
- [05863 Powis Lodge Powis Road · Blink Charging](https://ampmap.co.uk/charger/blink-charging-05863-powis-lodge-powis-road-uk) - Type 2 4 kW · Powis Lodge, Powis Road
- [Windlesham Gardens, Lamp Column 6 · Blink Charging](https://ampmap.co.uk/charger/blink-charging-windlesham-gardens-lamp-column-6-uk) - Type 2 4 kW · Lamp Column 6
- [05872 Davigdor Road · Blink Charging](https://ampmap.co.uk/charger/blink-charging-05872-davigdor-road-uk) - Type 2 4 kW · Davigdor Road
- [Compton Avenue · EB Charging](https://ampmap.co.uk/charger/eb-charging-compton-avenue-uk) - Type 2 4 kW · Compton Avenue
- [05781 West Hill Street · Blink Charging](https://ampmap.co.uk/charger/blink-charging-05781-west-hill-street-uk) - Type 2 4 kW · West Hill Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/eb-charging-montpelier-crescent-post-6-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 14 Feb 2022).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
