Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

GRIDSERVE · EV charging site

HU - Leicester East

Fletton Close, Humberstone, LE4 9LP

HU - Leicester East is an EV charging site in Humberstone, City of Leicester, run by GRIDSERVE and open 24 hours a day. All 6 of its sockets are 330 kW CCS, and the published price is £0.85 per kWh. Recorded live status shows it is usually busiest around 7 pm, and Amp Map measured 97% uptime and recorded 261 charging sessions here over the last 30 days. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is InstaVolt Sandhills Avenue (InstaVolt Ltd), 0.7 miles away.

Status

5 of 6 available

Checking status…

VerifiedLive status and details from GRIDSERVE’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 330 kW6 connectors · 85p per kWh5 free1 out of service
#192% reliabilityAvailable
#2100% reliabilityAvailable
#399% reliabilityAvailable
#4100% reliabilityAvailable
#593% reliabilityOut of order
#6100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
GRIDSERVE
Opening hours
Open 24 hours
Parking
Car park
Payment
Bank card at the chargerIn the GRIDSERVE appRFID card

Facilities

SupermarketSportsRecreationBus stop

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS330 kW85p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 330 kW CCS~21 min · ≈ 55 kWh · ~£47
Tesla Model 3 Rear-Wheel Drive 10–80% · 330 kW CCS~23 min · ≈ 40 kWh · ~£34
Audi Q4 e-tron 50 10–80% · 330 kW CCS~39 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 330 kW CCS~18 min · ≈ 51 kWh · ~£43
MG Motor MG4 Trophy 10–80% · 330 kW CCS~30 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 330 kW CCS~39 min · ≈ 41 kWh · ~£35

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at HU - Leicester East (GRIDSERVE)?

The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at HU - Leicester East (GRIDSERVE)?

Up to 330 kW DC via CCS.

How many charging sockets does HU - Leicester East (GRIDSERVE) have?

6 charging sockets: 6 × 330 kW CCS. Live per-socket availability is shown on this page.

Is HU - Leicester East (GRIDSERVE) open 24/7?

Yes - HU - Leicester East (GRIDSERVE) is open 24 hours a day, 7 days a week.

When is HU - Leicester East (GRIDSERVE) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 7 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is HU - Leicester East (GRIDSERVE)?

Amp Map measured 97% uptime here from recorded live status over the last 30 days, across 261 observed charging sessions.

Who operates HU - Leicester East?

HU - Leicester East is on the GRIDSERVE network.

Where is the nearest other charger with 50 kW or more to HU - Leicester East (GRIDSERVE)?

InstaVolt Sandhills Avenue (InstaVolt Ltd) is 0.7 miles away in a straight line, with up to 120 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at HU - Leicester East (GRIDSERVE)?

A typical 10–80% rapid charge takes about 21 min on the 330 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HU - Leicester East (GRIDSERVE)?

A typical 10–80% rapid charge takes about 23 min on the 330 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at HU - Leicester East (GRIDSERVE)?

A typical 10–80% rapid charge takes about 39 min on the 330 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.