Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

GRIDSERVE · EV charging site

HU - Moorland Way

Moorland Way, Lincoln, LN6 7JW

HU - Moorland Way is an EV charging site in Lincoln, Lincolnshire, run by GRIDSERVE and open 24 hours a day. Its 12 sockets reach up to 180 kW, with CCS at the top speed, and the published price is £0.85 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 408 charging sessions here over the last 30 days. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is McDonald's (InstaVolt Ltd), 0.1 miles away.

Status

9 of 12 available

Checking status…

VerifiedLive status and details from GRIDSERVE’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 180 kW10 connectors · 85p per kWh8 free1 in use1 status unknown
#1100% reliabilityAvailable
#3100% reliabilityAvailable
#4100% reliabilityAvailable
#5100% reliabilityAvailable
#6100% reliabilityAvailable
#7100% reliabilityStatus unknown
#9100% reliabilityAvailable
#10100% reliabilityAvailable
#11100% reliabilityCharging
#12100% reliabilityAvailable
CHAdeMO · 80 kW2 connectors · 85p per kWh1 free1 status unknown
#2100% reliabilityAvailable
#896% reliabilityStatus unknown

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
GRIDSERVE
Opening hours
Open 24 hours
Parking
On-street
Payment
Bank card at the chargerIn the GRIDSERVE appRFID card

Facilities

RestaurantCaféShoppingSupermarket

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS180 kW85p per kWh
CHAdeMO80 kW85p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 180 kW CCS~24 min · ≈ 55 kWh · ~£47
Tesla Model 3 Rear-Wheel Drive 10–80% · 180 kW CCS~23 min · ≈ 40 kWh · ~£34
Audi Q4 e-tron 50 10–80% · 180 kW CCS~39 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 180 kW CCS~20 min · ≈ 51 kWh · ~£43
MG Motor MG4 Trophy 10–80% · 180 kW CCS~30 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 180 kW CCS~39 min · ≈ 41 kWh · ~£35
Nissan LEAF 10–80% · 80 kW CHAdeMO~54 min · ≈ 28 kWh · ~£24

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at HU - Moorland Way (GRIDSERVE)?

The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at HU - Moorland Way (GRIDSERVE)?

Up to 180 kW DC via CCS, CHAdeMO.

How many charging sockets does HU - Moorland Way (GRIDSERVE) have?

12 charging sockets: 10 × 180 kW CCS, 2 × 80 kW CHAdeMO. Live per-socket availability is shown on this page.

Is HU - Moorland Way (GRIDSERVE) open 24/7?

Yes - HU - Moorland Way (GRIDSERVE) is open 24 hours a day, 7 days a week.

When is HU - Moorland Way (GRIDSERVE) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is HU - Moorland Way (GRIDSERVE)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 408 observed charging sessions.

Who operates HU - Moorland Way?

HU - Moorland Way is on the GRIDSERVE network.

Where is the nearest other charger with 50 kW or more to HU - Moorland Way (GRIDSERVE)?

McDonald's (InstaVolt Ltd) is 0.1 miles away in a straight line, with up to 120 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at HU - Moorland Way (GRIDSERVE)?

A typical 10–80% rapid charge takes about 24 min on the 180 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HU - Moorland Way (GRIDSERVE)?

A typical 10–80% rapid charge takes about 23 min on the 180 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at HU - Moorland Way (GRIDSERVE)?

A typical 10–80% rapid charge takes about 39 min on the 180 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.