# EH - MOTO Burton-in-Kendal · GRIDSERVE

Web page: https://ampmap.co.uk/charger/electric-highway-moto-burton-in-kendal-services-uk

EH - MOTO Burton-in-Kendal is an EV charging site in Morecambe, Lancashire, run by GRIDSERVE and open 24 hours a day. Its 18 sockets reach up to 350 kW, with CCS at the top speed, and published prices run from £0.59 to £0.92 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 99% uptime and recorded 2728 charging sessions here over the last 30 days.

## Status

18 of 18 open at 23 Nov 2026, 00:48 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** M6 Jct 36, LA6 1JF
- **Area:** Morecambe, Lancashire, United Kingdom
- **Coordinates (latitude, longitude):** 54.17902, -2.73483
- **Parking:** On-street
- **Getting there:** On the right as driving in to the services.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 350 kW | 7 | £0.92/kWh | 7 free |
| CCS or CHAdeMO | 350 kW | 5 | £0.92/kWh | 5 free |
| CCS | 60 kW | 3 | £0.92/kWh | 3 free |
| CHAdeMO | 60 kW | 1 | £0.92/kWh | 1 free |
| Type 2 | 11 kW | 2 | £0.59/kWh | 2 free |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** GRIDSERVE
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the GRIDSERVE app; RFID card
- **Facilities:** Hotel, Restaurant, Café, Shopping, Supermarket, Fuel station, Wi-Fi

## Common questions

### How much does it cost to charge at EH - MOTO Burton-in-Kendal (GRIDSERVE)?

The listed price is CCS £0.92/kWh · CHAdeMO £0.92/kWh · CCS £0.92/kWh · CHAdeMO £0.92/kWh · Type 2 £0.59/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at EH - MOTO Burton-in-Kendal (GRIDSERVE)?

Up to 350 kW DC via CCS, CHAdeMO, Type 2.

### How many charging sockets does EH - MOTO Burton-in-Kendal (GRIDSERVE) have?

18 charging sockets: 3 × 60 kW CCS, 1 × 60 kW CHAdeMO, 12 × 350 kW CCS, 5 × 100 kW CHAdeMO, 2 × 11 kW Type 2. Live per-socket availability is shown on this page.

### Is EH - MOTO Burton-in-Kendal (GRIDSERVE) open 24/7?

Yes - EH - MOTO Burton-in-Kendal (GRIDSERVE) is open 24 hours a day, 7 days a week.

### When is EH - MOTO Burton-in-Kendal (GRIDSERVE) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

### How reliable is EH - MOTO Burton-in-Kendal (GRIDSERVE)?

Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 2728 observed charging sessions.

### Who operates EH - MOTO Burton-in-Kendal?

EH - MOTO Burton-in-Kendal is on the GRIDSERVE network.

### How long does a Tesla Model Y Long Range take to charge at EH - MOTO Burton-in-Kendal (GRIDSERVE)?

A typical 10–80% rapid charge takes about 21 min on the 350 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - MOTO Burton-in-Kendal (GRIDSERVE)?

A typical 10–80% rapid charge takes about 23 min on the 350 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at EH - MOTO Burton-in-Kendal (GRIDSERVE)?

A typical 10–80% rapid charge takes about 39 min on the 350 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Morecambe](https://ampmap.co.uk/chargers/united-kingdom/lancashire/morecambe)
- [GRIDSERVE chargers](https://ampmap.co.uk/networks/gridserve)

## Chargers near this site

- [The Lakeland Wildlife Oasis · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-the-lakeland-wildlife-oasis-uk) - Type 2 7 kW
- [Booths Carnforth · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-booths-carnforth-uk) - CCS 50 kW, CHAdeMO 50 kW · Scotland Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/electric-highway-moto-burton-in-kendal-services-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: GRIDSERVE (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
