Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

GRIDSERVE · EV charging site

EH - MOTO Chieveley

Oxford Road, Newbury, RG18 9XX

EH - MOTO Chieveley is an EV charging site in Newbury, West Berkshire, run by GRIDSERVE and open 24 hours a day. Its 29 sockets reach up to 400 kW, with CCS at the top speed, and published prices run from £0.59 to £0.92 per kWh. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 100% uptime and recorded 10941 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is The Starting Gate, Newbury (Osprey Charging), 3.1 miles away.

Status

21 of 29 available

Checking status…

VerifiedLive status and details from GRIDSERVE’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 400 kW12 connectors · 92p per kWh8 free4 in use
#17100% reliabilityAvailable
#18100% reliabilityAvailable
#19100% reliabilityAvailable
#20100% reliabilityCharging
#2189% reliabilityAvailable
#22100% reliabilityCharging
#23100% reliabilityAvailable
#24100% reliabilityCharging
CCS · 350 kW6 connectors · 92p per kWh5 free1 in use
#5100% reliabilityAvailable
#6100% reliabilityAvailable
#8100% reliabilityAvailable
#12100% reliabilityCharging
#14100% reliabilityAvailable
#16100% reliabilityAvailable
CCS or CHAdeMO · 350 kW6 connectors · 92p per kWh3 free3 in use
#7100% reliabilityCharging
#9100% reliabilityCharging
#10100% reliabilityAvailable
#11100% reliabilityCharging
#13100% reliabilityAvailable
#15100% reliabilityAvailable
CCS · 50 kW3 connectors · 92p per kWh3 free
#1100% reliabilityAvailable
#3100% reliabilityAvailable
#4100% reliabilityAvailable
CHAdeMO · 50 kW1 connector · 92p per kWh1 free
#2100% reliabilityAvailable
Type 2 · 11 kW1 connector · 59p per kWh1 free
#29100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
GRIDSERVE
Opening hours
Open 24 hours
Parking
On-street
Payment
Bank card at the chargerIn the GRIDSERVE appRFID card
Getting there
M4 Junction 13

Facilities

RestaurantCaféSupermarketRecreationWi-Fi

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS400 kW92p per kWh
CCS350 kW92p per kWh
CHAdeMO100 kW92p per kWh
CCS50 kW92p per kWh
CHAdeMO50 kW92p per kWh
Type 211 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 400 kW CCS~21 min · ≈ 55 kWh · ~£51
Tesla Model 3 Rear-Wheel Drive 10–80% · 400 kW CCS~23 min · ≈ 40 kWh · ~£37
Audi Q4 e-tron 50 10–80% · 400 kW CCS~39 min · ≈ 51 kWh · ~£47
Hyundai IONIQ 5 10–80% · 400 kW CCS~18 min · ≈ 51 kWh · ~£47
MG Motor MG4 Trophy 10–80% · 400 kW CCS~30 min · ≈ 43 kWh · ~£39
Hyundai Kona Electric Long Range 10–80% · 400 kW CCS~39 min · ≈ 41 kWh · ~£37
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min · ≈ 28 kWh · ~£26

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at EH - MOTO Chieveley (GRIDSERVE)?

The listed price is CCS £0.92/kWh · CHAdeMO £0.92/kWh · CCS £0.92/kWh · CHAdeMO £0.92/kWh · Type 2 £0.59/kWh · CCS £0.92/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at EH - MOTO Chieveley (GRIDSERVE)?

Up to 400 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does EH - MOTO Chieveley (GRIDSERVE) have?

29 charging sockets: 3 × 50 kW CCS, 1 × 50 kW CHAdeMO, 12 × 350 kW CCS, 6 × 100 kW CHAdeMO, 1 × 11 kW Type 2, 12 × 400 kW CCS. Live per-socket availability is shown on this page.

Is EH - MOTO Chieveley (GRIDSERVE) open 24/7?

Yes - EH - MOTO Chieveley (GRIDSERVE) is open 24 hours a day, 7 days a week.

When is EH - MOTO Chieveley (GRIDSERVE) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is EH - MOTO Chieveley (GRIDSERVE)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 10941 observed charging sessions.

Who operates EH - MOTO Chieveley?

EH - MOTO Chieveley is on the GRIDSERVE network.

Where is the nearest other charger with 50 kW or more to EH - MOTO Chieveley (GRIDSERVE)?

The Starting Gate, Newbury (Osprey Charging) is 3.1 miles away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at EH - MOTO Chieveley (GRIDSERVE)?

A typical 10–80% rapid charge takes about 21 min on the 400 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - MOTO Chieveley (GRIDSERVE)?

A typical 10–80% rapid charge takes about 23 min on the 400 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at EH - MOTO Chieveley (GRIDSERVE)?

A typical 10–80% rapid charge takes about 39 min on the 400 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.