# EH - MOTO Exeter · GRIDSERVE

Web page: https://ampmap.co.uk/charger/electric-highway-moto-exeter-services-uk

EH - MOTO Exeter is an EV charging site in Heavitree, Devon, run by GRIDSERVE and open 24 hours a day. Its 46 sockets reach up to 400 kW, with CCS at the top speed, and published prices run from £0.59 to £0.89 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 99% uptime and recorded 10778 charging sessions here over the last 30 days.

## Status

27 of 46 open at 22 Nov 2026, 17:05 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Moor ln, EX2 7HF
- **Area:** Heavitree, Devon, United Kingdom
- **Coordinates (latitude, longitude):** 50.71572, -3.46454
- **Parking:** On-street

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 400 kW | 8 | £0.89/kWh | 4 free, 4 in use |
| CCS | 360 kW | 12 | £0.89/kWh | 6 free, 6 in use |
| CCS | 350 kW | 12 | £0.89/kWh | 9 free, 3 in use |
| CCS or CHAdeMO | 350 kW | 12 | £0.89/kWh | 6 free, 6 in use |
| Type 2 | 11 kW | 2 | £0.59/kWh | 2 free |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** GRIDSERVE
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the GRIDSERVE app; RFID card
- **Facilities:** Restaurant, Café, Supermarket, Fuel station, Wi-Fi

## Common questions

### How much does it cost to charge at EH - MOTO Exeter (GRIDSERVE)?

The listed price is CCS £0.89/kWh · CHAdeMO £0.89/kWh · CCS £0.89/kWh · Type 2 £0.59/kWh · CCS £0.89/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at EH - MOTO Exeter (GRIDSERVE)?

Up to 400 kW DC via CCS, CHAdeMO, Type 2.

### How many charging sockets does EH - MOTO Exeter (GRIDSERVE) have?

46 charging sockets: 24 × 350 kW CCS, 12 × 100 kW CHAdeMO, 12 × 360 kW CCS, 2 × 11 kW Type 2, 8 × 400 kW CCS. Live per-socket availability is shown on this page.

### Is EH - MOTO Exeter (GRIDSERVE) open 24/7?

Yes - EH - MOTO Exeter (GRIDSERVE) is open 24 hours a day, 7 days a week.

### When is EH - MOTO Exeter (GRIDSERVE) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

### How reliable is EH - MOTO Exeter (GRIDSERVE)?

Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 10778 observed charging sessions.

### Who operates EH - MOTO Exeter?

EH - MOTO Exeter is on the GRIDSERVE network.

### How long does a Tesla Model Y Long Range take to charge at EH - MOTO Exeter (GRIDSERVE)?

A typical 10–80% rapid charge takes about 21 min on the 400 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - MOTO Exeter (GRIDSERVE)?

A typical 10–80% rapid charge takes about 23 min on the 400 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at EH - MOTO Exeter (GRIDSERVE)?

A typical 10–80% rapid charge takes about 39 min on the 400 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Heavitree](https://ampmap.co.uk/chargers/united-kingdom/devon/heavitree)
- [Cheapest charging in Heavitree](https://ampmap.co.uk/chargers/united-kingdom/devon/heavitree/cheapest)
- [GRIDSERVE chargers](https://ampmap.co.uk/networks/gridserve)

## Chargers near this site

- [Exeter, UK · Tesla](https://ampmap.co.uk/charger/moto-exeter-services-tesla-uk) - CCS 250 kW · Sandygate Roundabout · From 24p/kWh
- [MOT4400404 · Moto Hospitality](https://ampmap.co.uk/charger/moto-hospitality-mot4400404-uk) - CCS 400 kW · 30 Sandygate Roundabout · From 89p/kWh
- [MOT4400403 · Moto Hospitality](https://ampmap.co.uk/charger/moto-hospitality-mot4400403-uk) - CCS 400 kW · 30 Sandygate Roundabout · From 89p/kWh
- [MOT4400414 · Moto Hospitality](https://ampmap.co.uk/charger/moto-hospitality-mot4400414-uk) - CCS 400 kW · 30 Sandygate Roundabout · From 89p/kWh
- [MOT4400419 · Moto Hospitality](https://ampmap.co.uk/charger/moto-hospitality-mot4400419-uk) - CCS 400 kW · 30 Sandygate Roundabout · From 89p/kWh
- [MOT4400405 · Moto Hospitality](https://ampmap.co.uk/charger/moto-hospitality-mot4400405-uk) - CCS 400 kW · 30 Sandygate Roundabout · From 89p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/electric-highway-moto-exeter-services-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: GRIDSERVE (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
