GRIDSERVE · EV charging site
EH - MOTO Frankley Southbound
Illey Ln, Bartley Green, B32 4AR
EH - MOTO Frankley Southbound is an EV charging site in Bartley Green, City and Borough of Birmingham, run by GRIDSERVE and open 24 hours a day. Its 23 sockets reach up to 400 kW, with CCS at the top speed, and published prices run from £0.59 to £0.92 per kWh. Recorded live status shows it is usually busiest around 3 pm, and Amp Map measured 100% uptime and recorded 3449 charging sessions here over the last 30 days. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Frankley, UK - Southbound (Tesla), 100 yards away.
Status
20 of 23 available
Checking status…
Connectors
CCS · 400 kW
CCS · 350 kW
CCS or CHAdeMO · 350 kW
CCS · 50 kW
CHAdeMO · 50 kW
Type 2 · 11 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- GRIDSERVE
- Opening hours
- Open 24 hours
- Parking
- On-street
- Payment
- Bank card at the chargerIn the GRIDSERVE appRFID card
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 400 kW | 92p per kWh |
| CCS | 350 kW | 92p per kWh |
| CHAdeMO | 100 kW | 92p per kWh |
| CCS | 50 kW | 92p per kWh |
| CHAdeMO | 50 kW | 92p per kWh |
| Type 2 | 11 kW | 59p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at EH - MOTO Frankley Southbound (GRIDSERVE)?
The listed price is CCS £0.92/kWh · CHAdeMO £0.92/kWh · CCS £0.92/kWh · CHAdeMO £0.92/kWh · Type 2 £0.59/kWh · CCS £0.92/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at EH - MOTO Frankley Southbound (GRIDSERVE)?
Up to 400 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does EH - MOTO Frankley Southbound (GRIDSERVE) have?
23 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 12 × 350 kW CCS, 2 × 100 kW CHAdeMO, 1 × 11 kW Type 2, 8 × 400 kW CCS. Live per-socket availability is shown on this page.
Is EH - MOTO Frankley Southbound (GRIDSERVE) open 24/7?
Yes - EH - MOTO Frankley Southbound (GRIDSERVE) is open 24 hours a day, 7 days a week.
When is EH - MOTO Frankley Southbound (GRIDSERVE) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is EH - MOTO Frankley Southbound (GRIDSERVE)?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 3449 observed charging sessions.
Who operates EH - MOTO Frankley Southbound?
EH - MOTO Frankley Southbound is on the GRIDSERVE network.
Where is the nearest other charger with 50 kW or more to EH - MOTO Frankley Southbound (GRIDSERVE)?
Frankley, UK - Southbound (Tesla) is 100 yards away in a straight line, with up to 250 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at EH - MOTO Frankley Southbound (GRIDSERVE)?
A typical 10–80% rapid charge takes about 21 min on the 400 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - MOTO Frankley Southbound (GRIDSERVE)?
A typical 10–80% rapid charge takes about 23 min on the 400 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EH - MOTO Frankley Southbound (GRIDSERVE)?
A typical 10–80% rapid charge takes about 39 min on the 400 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.