GRIDSERVE · EV charging site
EH - MOTO Thurrock
M25 Jct 30,31, South Ockendon, RM16 3BG
EH - MOTO Thurrock is an EV charging site in South Ockendon, Borough of Thurrock, run by GRIDSERVE and open 24 hours a day. Its 26 sockets reach up to 360 kW, with CCS at the top speed, and published prices run from £0.59 to £0.92 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 97% uptime and recorded 3252 charging sessions here over the last 30 days. 9 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Thurrock, UK (Tesla), 10 yards away.
Status
24 of 26 available
Checking status…
Connectors
CCS · 360 kW
CCS · 350 kW
CCS or CHAdeMO · 350 kW
Type 2 · 11 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- GRIDSERVE
- Opening hours
- Open 24 hours
- Parking
- On-street
- Payment
- Bank card at the chargerIn the GRIDSERVE appRFID card
- Getting there
- Right side of car park when facing Moto entrance.
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 360 kW | 92p per kWh |
| CCS | 350 kW | 92p per kWh |
| CHAdeMO | 100 kW | 92p per kWh |
| Type 2 | 11 kW | 59p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at EH - MOTO Thurrock (GRIDSERVE)?
The listed price is CCS £0.92/kWh · CHAdeMO £0.92/kWh · Type 2 £0.59/kWh · CCS £0.92/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at EH - MOTO Thurrock (GRIDSERVE)?
Up to 360 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does EH - MOTO Thurrock (GRIDSERVE) have?
26 charging sockets: 12 × 350 kW CCS, 6 × 100 kW CHAdeMO, 2 × 11 kW Type 2, 12 × 360 kW CCS. Live per-socket availability is shown on this page.
Is EH - MOTO Thurrock (GRIDSERVE) open 24/7?
Yes - EH - MOTO Thurrock (GRIDSERVE) is open 24 hours a day, 7 days a week.
When is EH - MOTO Thurrock (GRIDSERVE) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is EH - MOTO Thurrock (GRIDSERVE)?
Amp Map measured 97% uptime here from recorded live status over the last 30 days, across 3252 observed charging sessions.
Who operates EH - MOTO Thurrock?
EH - MOTO Thurrock is on the GRIDSERVE network.
Where is the nearest other charger with 50 kW or more to EH - MOTO Thurrock (GRIDSERVE)?
Thurrock, UK (Tesla) is 10 yards away in a straight line, with up to 250 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at EH - MOTO Thurrock (GRIDSERVE)?
A typical 10–80% rapid charge takes about 21 min on the 360 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - MOTO Thurrock (GRIDSERVE)?
A typical 10–80% rapid charge takes about 23 min on the 360 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EH - MOTO Thurrock (GRIDSERVE)?
A typical 10–80% rapid charge takes about 39 min on the 360 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Thurrock, UK
- Moto Thurrock M25 Services Nomadpower
- Pod Point Tesco Extra - Lakeside
- Pod Point Thurrock Shopping Park (Thurrock Retail Park Unit Trust)
- McDonald's West Thurrock
- 800 Arterial Road West Thurrock
- Cheapest nearby
- Pod Point Tesco Extra - Lakeside · 44.4p per kWh · 50 kW · 0.3 mi