GRIDSERVE · EV charging site
EH - MOTO Winchester Northbound
Chillandham Lane, Winchester, SO21 1PP
EH - MOTO Winchester Northbound is an EV charging site in Winchester, Hampshire, run by GRIDSERVE and open 24 hours a day. Its 12 sockets reach up to 130 kW, with CCS at the top speed, and published prices run from £0.59 to £0.92 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 61% uptime and recorded 1159 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is EH - MOTO Winchester Southbound (GRIDSERVE), 0.3 miles away.
Status
1 of 12 available
Checking status…
Connectors
CCS · 130 kW
CCS · 40 kW
CHAdeMO · 40 kW
Type 2 · 11 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- GRIDSERVE
- Opening hours
- Open 24 hours
- Parking
- On-street
- Payment
- Bank card at the chargerIn the GRIDSERVE appRFID card
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 130 kW | 92p per kWh |
| CCS | 40 kW | 92p per kWh |
| CHAdeMO | 40 kW | 92p per kWh |
| Type 2 | 11 kW | 59p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at EH - MOTO Winchester Northbound (GRIDSERVE)?
The listed price is CCS £0.92/kWh · CHAdeMO £0.92/kWh · CCS £0.92/kWh · Type 2 £0.59/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at EH - MOTO Winchester Northbound (GRIDSERVE)?
Up to 130 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does EH - MOTO Winchester Northbound (GRIDSERVE) have?
12 charging sockets: 3 × 40 kW CCS, 1 × 40 kW CHAdeMO, 6 × 130 kW CCS, 2 × 11 kW Type 2. Live per-socket availability is shown on this page.
Is EH - MOTO Winchester Northbound (GRIDSERVE) open 24/7?
Yes - EH - MOTO Winchester Northbound (GRIDSERVE) is open 24 hours a day, 7 days a week.
When is EH - MOTO Winchester Northbound (GRIDSERVE) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is EH - MOTO Winchester Northbound (GRIDSERVE)?
Amp Map measured 61% uptime here from recorded live status over the last 30 days, across 1159 observed charging sessions.
Who operates EH - MOTO Winchester Northbound?
EH - MOTO Winchester Northbound is on the GRIDSERVE network.
Where is the nearest other charger with 50 kW or more to EH - MOTO Winchester Northbound (GRIDSERVE)?
EH - MOTO Winchester Southbound (GRIDSERVE) is 0.3 miles away in a straight line, with up to 130 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at EH - MOTO Winchester Northbound (GRIDSERVE)?
A typical 10–80% rapid charge takes about 29 min on the 130 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - MOTO Winchester Northbound (GRIDSERVE)?
A typical 10–80% rapid charge takes about 25 min on the 130 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EH - MOTO Winchester Northbound (GRIDSERVE)?
A typical 10–80% rapid charge takes about 39 min on the 130 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.