# EH - Welcome Break Sarn Park · GRIDSERVE

Web page: https://ampmap.co.uk/charger/electric-highway-welcome-break-sarn-park-services-uk

EH - Welcome Break Sarn Park is an EV charging site in Coity, Bridgend county borough, run by GRIDSERVE and open 24 hours a day. Its 6 sockets reach up to 40 kW, with CCS and CHAdeMO at the top speed, and the published price is £0.92 per kWh. Recorded live status shows it is usually busiest around 3 pm, and Amp Map measured 99% uptime and recorded 380 charging sessions here over the last 30 days.

## Status

6 of 6 open at 22 Nov 2026, 21:58 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** M4 Jct 36, CF32 9SY
- **Area:** Coity, Bridgend county borough, United Kingdom
- **Coordinates (latitude, longitude):** 51.53489, -3.57673
- **Parking:** On-street
- **Getting there:** In front of the entrance to Welcome Break building.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 40 kW | 2 | £0.92/kWh | 2 free |
| CHAdeMO | 40 kW | 2 | £0.92/kWh | 2 free |
| Type 2 | 22 kW | 2 | £0.92/kWh | 2 free |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** GRIDSERVE
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the GRIDSERVE app; RFID card
- **Facilities:** Hotel, Restaurant, Café, Shopping, Supermarket, Fuel station, Wi-Fi

## Common questions

### How much does it cost to charge at EH - Welcome Break Sarn Park (GRIDSERVE)?

The listed price is £0.92/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at EH - Welcome Break Sarn Park (GRIDSERVE)?

Up to 40 kW DC via CCS, CHAdeMO, Type 2.

### How many charging sockets does EH - Welcome Break Sarn Park (GRIDSERVE) have?

6 charging sockets: 2 × 40 kW CCS, 2 × 40 kW CHAdeMO, 2 × 22 kW Type 2. Live per-socket availability is shown on this page.

### Is EH - Welcome Break Sarn Park (GRIDSERVE) open 24/7?

Yes - EH - Welcome Break Sarn Park (GRIDSERVE) is open 24 hours a day, 7 days a week.

### When is EH - Welcome Break Sarn Park (GRIDSERVE) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is EH - Welcome Break Sarn Park (GRIDSERVE)?

Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 380 observed charging sessions.

### Who operates EH - Welcome Break Sarn Park?

EH - Welcome Break Sarn Park is on the GRIDSERVE network.

### How long does a Tesla Model Y Long Range take to charge at EH - Welcome Break Sarn Park (GRIDSERVE)?

A typical 10–80% rapid charge takes about 87 min on the 40 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - Welcome Break Sarn Park (GRIDSERVE)?

A typical 10–80% rapid charge takes about 63 min on the 40 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at EH - Welcome Break Sarn Park (GRIDSERVE)?

A typical 10–80% rapid charge takes about 81 min on the 40 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Coity](https://ampmap.co.uk/chargers/united-kingdom/bridgend-county-borough/coity)
- [GRIDSERVE chargers](https://ampmap.co.uk/networks/gridserve)

## Chargers near this site

- [Applegreen Electric Sarn Park · Applegreen Fast Charge](https://ampmap.co.uk/charger/applegreen-fast-charge-applegreen-electric-sarn-park-uk) - CCS 180 kW · Sarn Park Services
- [Sarn Park, UK · Tesla](https://ampmap.co.uk/charger/tesla-sarn-park-uk-uk) - CCS 250 kW, CCS / Type 2 130 kW · M4 Junction 36 · From 56p/kWh
- [Bridgend, UK · Tesla](https://ampmap.co.uk/charger/tesla-bridgend-uk-uk) - CCS 250 kW · Bridgend Designer Outlet · From 29p/kWh
- [Rawowned Bridgend 1 · ChargePoint](https://ampmap.co.uk/charger/chargepoint-rawowned-bridgend-1-uk) - Type 2 22 kW · Wales Designer Outlet Village
- [Sarn Station Park & Ride 1 · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-sarn-station-park-and-ride-1-uk) - Type 2 7 kW · Sarn Station Park & Ride
- [Hope Street, Aberkenfig · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-hope-street-aberkenfig-uk) - Type 2 22 kW · Hope Street Carpark

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/electric-highway-welcome-break-sarn-park-services-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: GRIDSERVE (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
