ElectRoad · EV charging site
Coddenham Centre
Mary Day Close, Stowmarket, IP6 9SR
Coddenham Centre is an EV charging site in Stowmarket, Suffolk, run by ElectRoad. Both of its sockets are 7 kW Type 2. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Needham Lake (ElectRoad), 2.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ElectRoad
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Coddenham Centre (ElectRoad)?
Up to 7 kW AC via Type 2.
How many charging sockets does Coddenham Centre (ElectRoad) have?
2 charging sockets: 4 × 7 kW Type 2.
Who operates Coddenham Centre?
Coddenham Centre is on the ElectRoad network.
Where is the nearest charger with 50 kW or more to Coddenham Centre (ElectRoad)?
Needham Lake (ElectRoad) is 2.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Coddenham Centre (ElectRoad)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Coddenham Centre (ElectRoad)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Coddenham Centre (ElectRoad)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Crown (Claydon) · 85p per kWh · 75 kW · 2.9 mi
- Fastest nearby
- Crown (Claydon) · 75 kW · 2.9 mi