ElectRoad · EV charging site
SN&B Poringland
Crafton House, Norwich, NR14 7XP
SN&B Poringland is an EV charging site in Norwich, Norfolk, run by ElectRoad. All 4 of its sockets are 7 kW Type 2. No other charging site is listed within a mile, and the nearest site with 50 kW or more is EVC Dunston Hall Hotel (Roam Charging), 2.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ElectRoad
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at SN&B Poringland (ElectRoad)?
Up to 7 kW AC via Type 2.
How many charging sockets does SN&B Poringland (ElectRoad) have?
4 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates SN&B Poringland?
SN&B Poringland is on the ElectRoad network.
Where is the nearest charger with 50 kW or more to SN&B Poringland (ElectRoad)?
EVC Dunston Hall Hotel (Roam Charging) is 2.6 miles away in a straight line, with up to 100 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at SN&B Poringland (ElectRoad)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at SN&B Poringland (ElectRoad)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at SN&B Poringland (ElectRoad)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Pod Point McDonald's - Barrett Road Norwich · 27.6p per kWh · 7 kW · 3.9 mi
- Fastest nearby
- EVC Dunston Hall Hotel · 100 kW · 2.6 mi