Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

ElectRoad · EV charging site

Stumpys Way

Industrial Estate, Bowthorpe, NR11 6SS

Stumpys Way is an EV charging site in Bowthorpe, Norfolk, run by ElectRoad. Both of its sockets are 50 kW Type 2. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Aylsham SF Connect (BP Pulse), 0.8 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 4 Mar 2025Last verified 4 Mar 2025

Connectors

Type 2 · 50 kW2 connectors

Site information

Operator
ElectRoad
Opening hours
Not published
Access
Public
Payment
Pay at the charger (from Open Charge Map)

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW Type 2~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW Type 2~50 min
Audi Q4 e-tron 50 10–80% · 50 kW Type 2~66 min
Hyundai IONIQ 5 10–80% · 50 kW Type 2~64 min
MG Motor MG4 Trophy 10–80% · 50 kW Type 2~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW Type 2~55 min
Nissan LEAF 10–80% · 50 kW Type 2~55 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Stumpys Way (ElectRoad)?

Up to 50 kW DC via Type 2.

How many charging sockets does Stumpys Way (ElectRoad) have?

2 charging sockets: 1 × 50 kW Type 2, 1 × 50 kW Type 2.

Who operates Stumpys Way?

Stumpys Way is on the ElectRoad network.

Where is the nearest other charger with 50 kW or more to Stumpys Way (ElectRoad)?

Aylsham SF Connect (BP Pulse) is 0.8 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Stumpys Way (ElectRoad)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Stumpys Way (ElectRoad)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Stumpys Way (ElectRoad)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 4 Mar 2025

Amp Map does not take payment. You pay the operator.