Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

ElectRoad · EV charging site

Weavers Court

Weavers Court, Diss, IP22 4QH

Weavers Court is an EV charging site in Diss, Norfolk, run by ElectRoad. All 4 of its sockets are 22 kW Type 2. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Thatchers Needle, Diss (Osprey Charging), 0.4 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 4 Mar 2025Last verified 4 Mar 2025

Connectors

Type 2 · 22 kW4 connectors

Site information

Operator
ElectRoad
Opening hours
Not published
Access
Public · membership required · access key required

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Weavers Court (ElectRoad)?

Up to 22 kW AC via Type 2.

How many charging sockets does Weavers Court (ElectRoad) have?

4 charging sockets: 2 × 22 kW Type 2, 2 × 22 kW Type 2.

Who operates Weavers Court?

Weavers Court is on the ElectRoad network.

Where is the nearest charger with 50 kW or more to Weavers Court (ElectRoad)?

Thatchers Needle, Diss (Osprey Charging) is 0.4 miles away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Weavers Court (ElectRoad)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Weavers Court (ElectRoad)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Weavers Court (ElectRoad)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 4 Mar 2025