BP Pulse · EV charging site
Sheringham Road
Sheringham Road, Highbury, N7 8NX
Sheringham Road is an EV charging site in Highbury, Greater London, run by BP Pulse and open 24 hours a day. Both of its sockets are 50 kW CCS and CHAdeMO. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 98% uptime and recorded 265 charging sessions here over the last 30 days. 213 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Shell Recharge Shell Little Waitrose Holloway, 0.3 miles away.
Status
1 of 2 available
Checking status…
Connectors
CCS · 50 kW
CHAdeMO · 50 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the BP Pulse appRFID card
- Charger ID
- BPT041
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Sheringham Road (BP Pulse)?
Up to 50 kW DC via CCS, CHAdeMO.
How many charging sockets does Sheringham Road (BP Pulse) have?
2 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.
Is Sheringham Road (BP Pulse) open 24/7?
Yes - Sheringham Road (BP Pulse) is open 24 hours a day, 7 days a week.
When is Sheringham Road (BP Pulse) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Sheringham Road (BP Pulse)?
Amp Map measured 98% uptime here from recorded live status over the last 30 days, across 265 observed charging sessions.
Who operates Sheringham Road?
Sheringham Road is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to Sheringham Road (BP Pulse)?
Shell Recharge Shell Little Waitrose Holloway is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Sheringham Road (BP Pulse)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Sheringham Road (BP Pulse)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Sheringham Road (BP Pulse)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 67 Bride Street, Opp. Junc. Lough Road
- ubitricity Distributed Energy Systems UK Ltd. 79 Bride Street
- ubitricity Distributed Energy Systems UK Ltd. 55 Ellington Street
- ubitricity Distributed Energy Systems UK Ltd. 29 Ellington Street
- ubitricity Distributed Energy Systems UK Ltd. 20 Ellington Street, Junc. Arundel Square
- Lough Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 67 Bride Street, Opp. Junc. Lough Road · 56p per kWh · 5 kW · 130 yd