# Sheringham Road · BP Pulse

Web page: https://ampmap.co.uk/charger/elektrobay-sheringham-road-uk

Sheringham Road is an EV charging site in Highbury, Greater London, run by BP Pulse and open 24 hours a day. Both of its sockets are 50 kW CCS and CHAdeMO. Recorded live status shows it is usually busiest around noon, and Amp Map measured 98% uptime and recorded 268 charging sessions here over the last 30 days.

## Status

2 of 2 open at 22 Nov 2026, 17:40 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Sheringham Road, N7 8NX
- **Area:** Highbury, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.54725, -0.11205

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed | 1 free |
| CHAdeMO | 50 kW | 1 | Not listed | 1 free |

## Site information

- **Operator:** BP Pulse
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the BP Pulse app; RFID card

## Common questions

### How fast is charging at Sheringham Road (BP Pulse)?

Up to 50 kW DC via CCS, CHAdeMO.

### How many charging sockets does Sheringham Road (BP Pulse) have?

2 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.

### Is Sheringham Road (BP Pulse) open 24/7?

Yes - Sheringham Road (BP Pulse) is open 24 hours a day, 7 days a week.

### When is Sheringham Road (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is Sheringham Road (BP Pulse)?

Amp Map measured 98% uptime here from recorded live status over the last 30 days, across 268 observed charging sessions.

### Who operates Sheringham Road?

Sheringham Road is on the BP Pulse network.

### How long does a Tesla Model Y Long Range take to charge at Sheringham Road (BP Pulse)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Sheringham Road (BP Pulse)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Sheringham Road (BP Pulse)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Highbury](https://ampmap.co.uk/chargers/united-kingdom/greater-london/highbury)
- [Cheapest charging in Highbury](https://ampmap.co.uk/chargers/united-kingdom/greater-london/highbury/cheapest)
- [BP Pulse chargers](https://ampmap.co.uk/networks/bp-pulse)

## Chargers near this site

- [ubitricity Distributed Energy Systems UK Ltd. 67 Bride Street, Opp. Junc. Lough Road](https://ampmap.co.uk/charger/ubitricity-67-bride-street-opp-junc-lough-road-uk) - Ubitricity · Type 2 5 kW · 67 Bride Street, Opp. Junc. Lough Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 79 Bride Street](https://ampmap.co.uk/charger/ubitricity-79-bride-street-uk) - Ubitricity · Type 2 5 kW · 79 Bride Street · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 55 Ellington Street](https://ampmap.co.uk/charger/ubitricity-55-ellington-street-uk) - Ubitricity · Type 2 5 kW · 55 Ellington Street · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 29 Ellington Street](https://ampmap.co.uk/charger/ubitricity-29-ellington-street-uk) - Ubitricity · Type 2 5 kW · 29 Ellington Street · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 20 Ellington Street, Junc. Arundel Square](https://ampmap.co.uk/charger/ubitricity-20-ellington-street-junc-arundel-square-uk) - Ubitricity · Type 2 5 kW · 20 Ellington Street, Junc. Arundel Square · From 45p/kWh
- [Lough Road · Total Energies](https://ampmap.co.uk/charger/total-energies-lough-road-uk) - Type 2 7 kW · Lough Road junction with MacKenzie Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/elektrobay-sheringham-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: BP Pulse (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
