Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Engie · EV charging site

EuroTunnel

Ashford Road, Folkestone, CT18 8AP

EuroTunnel is an EV charging site in Folkestone, Kent, run by Engie. Its 8 sockets reach up to 210 kW, with CCS at the top speed. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Folkestone - France Bound Only, UK (Tesla), 50 yards away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 26 Feb 2026Last verified 26 Feb 2026

Connectors

CCS · 210 kW7 connectors
CCS · 90 kW1 connector
CHAdeMO · 90 kW1 connector
CHAdeMO · 60 kW1 connector
Type 2 · 22 kW1 connector

Site information

Operator
Engie
Opening hours
Not published
Access
Public

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 210 kW CCS~23 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 210 kW CCS~23 min
Audi Q4 e-tron 50 10–80% · 210 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 210 kW CCS~19 min
MG Motor MG4 Trophy 10–80% · 210 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 210 kW CCS~39 min
Nissan LEAF 10–80% · 90 kW CHAdeMO~54 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at EuroTunnel (Engie)?

Up to 210 kW DC via CHAdeMO, CCS, Type 2.

How many charging sockets does EuroTunnel (Engie) have?

8 charging sockets: 1 × 60 kW CHAdeMO, 1 × 90 kW CCS, 1 × 22 kW Type 2, 7 × 210 kW CCS, 1 × 90 kW CHAdeMO.

Who operates EuroTunnel?

EuroTunnel is on the Engie network.

Where is the nearest other charger with 50 kW or more to EuroTunnel (Engie)?

Folkestone - France Bound Only, UK (Tesla) is 50 yards away in a straight line, with up to 130 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at EuroTunnel (Engie)?

A typical 10–80% rapid charge takes about 23 min on the 210 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EuroTunnel (Engie)?

A typical 10–80% rapid charge takes about 23 min on the 210 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at EuroTunnel (Engie)?

A typical 10–80% rapid charge takes about 39 min on the 210 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 26 Feb 2026