# Cedar Road · EO Charging

Web page: https://ampmap.co.uk/charger/eo-charging-cedar-road-uk

Cedar Road is an EV charging site in Lancaster, Lancashire, run by EO Charging. Both of its sockets are 22 kW Type 2.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Cedar Road Car Park, LA1 5RH
- **Area:** Lancaster, Lancashire, United Kingdom
- **Coordinates (latitude, longitude):** 54.05048, -2.81400

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 2 | Not listed |

## Site information

- **Operator:** EO Charging
- **Opening hours:** Not published
- **Access:** Public
- **Payment:** Pay at the charger (from Open Charge Map)

## Common questions

### How fast is charging at Cedar Road (EO Charging)?

Up to 22 kW AC via Type 2.

### How many charging sockets does Cedar Road (EO Charging) have?

2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.

### Who operates Cedar Road?

Cedar Road is on the EO Charging network. For site issues, the operator lists +44 333 772 0383.

### How long does a Tesla Model Y Long Range take to charge at Cedar Road (EO Charging)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cedar Road (EO Charging)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Cedar Road (EO Charging)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Lancaster](https://ampmap.co.uk/chargers/united-kingdom/lancashire/lancaster)
- [EO Charging chargers](https://ampmap.co.uk/networks/eo-charging)

## Chargers near this site

- [Dallas Road Car Park · EO Charging](https://ampmap.co.uk/charger/eo-charging-dallas-road-car-park-uk) - Type 2 22 kW · Dallas Road Car Park
- [Lancaster Boys & Girls Club CMS Lancaster · EO Charging](https://ampmap.co.uk/charger/eo-charging-lancaster-boys-and-girls-club-cms-lancaster-uk) - Type 2 22 kW · Dallas Rd
- [Salt Ayre · EO Charging](https://ampmap.co.uk/charger/eo-charging-salt-ayre-uk) - Type 2 22 kW · Salt Ayre
- [Lancaster - Spring Garden CP 1 · Blink Charging](https://ampmap.co.uk/charger/blink-charging-lancaster-spring-garden-cp-1-uk) - CHAdeMO 50 kW, Type 2 50 kW · Spring Garden
- [David Hayton Nissan](https://ampmap.co.uk/charger/david-hayton-nissan-uk) - J-1772 3 kW · White Lund Industrial Estate
- [Greaves Park (Lancaster) · evyve](https://ampmap.co.uk/charger/evyve-greaves-park-lancaster-uk) - CCS 75 kW, CHAdeMO 75 kW · Bowerham Road · From 85p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/eo-charging-cedar-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 7 Dec 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
