EO Charging · EV charging site
Christie Avenue
Christie Avenue, Morecambe, LA4 5UR
Christie Avenue is an EV charging site in Morecambe, Lancashire, run by EO Charging. Both of its sockets are 22 kW Type 2, and the price is listed as 48p per kWh. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Cross Keys (Slyne) (evyve), 2.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- EO Charging
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- 48p per kWh(from Open Charge Map, 23 Mar 2023)
- Phone (from Open Charge Map)
- +44 333 772 0383
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Christie Avenue (EO Charging)?
The listed price is 48p per kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Christie Avenue (EO Charging)?
Up to 22 kW AC via Type 2.
How many charging sockets does Christie Avenue (EO Charging) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Christie Avenue?
Christie Avenue is on the EO Charging network. For site issues, the operator lists +44 333 772 0383.
Where is the nearest charger with 50 kW or more to Christie Avenue (EO Charging)?
Cross Keys (Slyne) (evyve) is 2.3 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Christie Avenue (EO Charging)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Christie Avenue (EO Charging)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Christie Avenue (EO Charging)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- David Hayton Nissan
- Marine Road Central Morecambe
- Festival Market Car Park
- Salt Ayre
- Cedar Road
- Tarnbrook Road
- Cheapest nearby
- Marine Road Central Morecambe · 65p per kWh · 7 kW · 0.9 mi