EO Charging · EV charging site
Dallas Road Car Park
Dallas Road Car Park, Lancaster, LA1 1TW
Dallas Road Car Park is an EV charging site in Lancaster, Lancashire, run by EO Charging. Both of its sockets are 22 kW Type 2. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Lancaster - Spring Garden CP 1 (Blink Charging), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- EO Charging
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +44 333 772 0383
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Dallas Road Car Park (EO Charging)?
Up to 22 kW AC via Type 2.
How many charging sockets does Dallas Road Car Park (EO Charging) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Dallas Road Car Park?
Dallas Road Car Park is on the EO Charging network. For site issues, the operator lists +44 333 772 0383.
Where is the nearest charger with 50 kW or more to Dallas Road Car Park (EO Charging)?
Lancaster - Spring Garden CP 1 (Blink Charging) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Dallas Road Car Park (EO Charging)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Dallas Road Car Park (EO Charging)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Dallas Road Car Park (EO Charging)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Lancaster Boys & Girls Club CMS Lancaster
- Lancaster - Spring Garden CP 1
- Cedar Road
- Greaves Park (Lancaster)
- Williamson Park Car Park
- Salt Ayre
- Cheapest nearby
- Greaves Park (Lancaster) · 85p per kWh · 75 kW · 0.6 mi
- Fastest nearby
- Greaves Park (Lancaster) · 75 kW · 0.6 mi