# Eden Housing Association CMS · EO Charging

Web page: https://ampmap.co.uk/charger/eo-charging-eden-housing-association-cms-uk

Eden Housing Association CMS is an EV charging site in Penrith, Cumbria, run by EO Charging. Both of its sockets are 22 kW Type 2, and the price is listed as 27p - 40p.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Blain House, CA11 8JB
- **Area:** Penrith, Cumbria, United Kingdom
- **Coordinates (latitude, longitude):** 54.65829, -2.74518

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 2 | Not listed |

- **Price:** 27p - 40p (from Open Charge Map)

## Site information

- **Operator:** EO Charging
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How much does it cost to charge at Eden Housing Association CMS (EO Charging)?

The listed price is 27p - 40p. Prices can change, so check the price at the charger before you start.

### How fast is charging at Eden Housing Association CMS (EO Charging)?

Up to 22 kW AC via Type 2.

### How many charging sockets does Eden Housing Association CMS (EO Charging) have?

2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.

### Who operates Eden Housing Association CMS?

Eden Housing Association CMS is on the EO Charging network. For site issues, the operator lists +44 333 772 0383.

### How long does a Tesla Model Y Long Range take to charge at Eden Housing Association CMS (EO Charging)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Eden Housing Association CMS (EO Charging)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Eden Housing Association CMS (EO Charging)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Penrith](https://ampmap.co.uk/chargers/united-kingdom/cumbria/penrith)
- [EO Charging chargers](https://ampmap.co.uk/networks/eo-charging)

## Chargers near this site

- [The George Hotel · Monta](https://ampmap.co.uk/charger/monta-the-george-hotel-uk) - Type 2 3 kW · Devonshire Street
- [Enozzle Ltd - The George Hotel site](https://ampmap.co.uk/charger/enozzle-ltd-the-george-hotel-site-uk) - Type 2 7 kW · Devonshire St
- [MFG Morrisons Penrith · MFG EV Power](https://ampmap.co.uk/charger/mfg-ev-power-mfg-morrisons-penrith-uk) - CCS 50 kW · Brunswick Road
- [North Lakes Hotel & Spa · E.ON (DK)](https://ampmap.co.uk/charger/e-on-north-lakes-hotel-and-spa-uk) - Type 2 11 kW · Ullswater Road
- [Booths Penrith · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-booths-penrith-uk) - CCS 50 kW, CHAdeMO 50 kW · Booths Car Park
- [Pod Point Ullswater Road Garage](https://ampmap.co.uk/charger/pod-point-ullswater-road-garage-uk) - Type 2 22 kW · 10 Ullswater Road · From 69.6p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/eo-charging-eden-housing-association-cms-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 23 Apr 2022).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
