EO Charging · EV charging site
Thirteen Housing
2 Hudson Quay, Middlesbrough, TS2 1QG
Thirteen Housing is an EV charging site in Middlesbrough, run by EO Charging. All 4 of its sockets are 7 kW Type 2. 29 other charging sites are listed within a mile, and the nearest site with 50 kW or more is MIMA Car Park, Middlesbrough (Blink Charging), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- EO Charging
- Opening hours
- Not published
- Access
- Customers only
- Phone (from Open Charge Map)
- +44 333 772 0383
- Getting there
- Barrier entry/exit
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Thirteen Housing (EO Charging)?
Up to 7 kW AC via Type 2.
How many charging sockets does Thirteen Housing (EO Charging) have?
4 charging sockets: 2 × 7 kW Type 2, 2 × 7 kW Type 2.
Who operates Thirteen Housing?
Thirteen Housing is on the EO Charging network. For site issues, the operator lists +44 333 772 0383.
Can anyone charge at Thirteen Housing (EO Charging)?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Thirteen Housing (EO Charging)?
MIMA Car Park, Middlesbrough (Blink Charging) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Thirteen Housing (EO Charging)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Thirteen Housing (EO Charging)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Thirteen Housing (EO Charging)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Windward Way
- Rivers House
- ubitricity Distributed Energy Systems UK Ltd. 10 Bright Street
- ubitricity Distributed Energy Systems UK Ltd. 12 Bright St
- ubitricity Distributed Energy Systems UK Ltd. 100 N Ormesby Road, Opp.
- Middlesbrough College
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 10 Bright Street · 56p per kWh · 5 kW · 0.2 mi