EO Charging · EV charging site
Thwaites Village Hall
Thwaites Village Hall, Barrow in Furness, LA18 5HL
Thwaites Village Hall is an EV charging site in Barrow in Furness, Cumbria, run by EO Charging. Both of its sockets are 22 kW Type 2, and the price is listed as 27p - 40p. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Ulverston - Brewery Street Car park (GeniePoint), 7.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- EO Charging
- Opening hours
- Not published
- Access
- Public
- Price
- 27p - 40p(from Open Charge Map, 23 Apr 2022)
- Phone (from Open Charge Map)
- +44 333 772 0383
- Getting there
- Charge my Street App
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Thwaites Village Hall (EO Charging)?
The listed price is 27p - 40p. Prices can change, so check the price at the charger before you start.
How fast is charging at Thwaites Village Hall (EO Charging)?
Up to 22 kW AC via Type 2.
How many charging sockets does Thwaites Village Hall (EO Charging) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Thwaites Village Hall?
Thwaites Village Hall is on the EO Charging network. For site issues, the operator lists +44 333 772 0383.
Where is the nearest charger with 50 kW or more to Thwaites Village Hall (EO Charging)?
Ulverston - Brewery Street Car park (GeniePoint) is 7.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Thwaites Village Hall (EO Charging)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Thwaites Village Hall (EO Charging)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Thwaites Village Hall (EO Charging)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.