ePower · EV charging site
Barbican Centra A1, Banbridge
Dromore Rd, Banbridge, BT32 4ET
Barbican Centra A1, Banbridge is an EV charging site in Banbridge, Armagh City Banbridge and Craigavon, run by ePower. Both of its sockets are 150 kW CCS. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Maxol Service Station (BP Pulse), 2.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ePower
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- 1800 99 88 77
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Barbican Centra A1, Banbridge (ePower)?
Up to 150 kW DC via CCS.
How many charging sockets does Barbican Centra A1, Banbridge (ePower) have?
2 charging sockets: 2 × 150 kW CCS.
Who operates Barbican Centra A1, Banbridge?
Barbican Centra A1, Banbridge is on the ePower network. For site issues, the operator lists 1800 99 88 77.
Where is the nearest other charger with 50 kW or more to Barbican Centra A1, Banbridge (ePower)?
Maxol Service Station (BP Pulse) is 2.8 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Barbican Centra A1, Banbridge (ePower)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Barbican Centra A1, Banbridge (ePower)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Barbican Centra A1, Banbridge (ePower)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Tesco Superstore - Banbridge
- Downshire Place
- Townsend Street Car Park
- Downshire Arms
- Maxol Service Station
- Banbridge Health Centre
- Cheapest nearby
- Pod Point Tesco Superstore - Banbridge · 44.4p per kWh · 7 kW · 2.4 mi