ESB Ecars · EV charging site
Ballee Road Park & Share Seven Towers Roundabout Ballymena
Ballee Road Park and Share, Ballymena, BT42 2HD
Ballee Road Park & Share Seven Towers Roundabout Ballymena is an EV charging site in Ballymena, Mid and East Antrim, run by ESB Ecars. Both of its sockets are 22 kW Type 2. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Maxol Ballymena (ESB Ecars), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- ESB Ecars
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- 1890 372 387
- Getting there
- Ballee Road Park and Share, Ballymena
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Ballee Road Park & Share Seven Towers Roundabout Ballymena (ESB Ecars)?
Up to 22 kW AC via Type 2.
How many charging sockets does Ballee Road Park & Share Seven Towers Roundabout Ballymena (ESB Ecars) have?
2 charging sockets: 2 × 22 kW Type 2.
Who operates Ballee Road Park & Share Seven Towers Roundabout Ballymena?
Ballee Road Park & Share Seven Towers Roundabout Ballymena is on the ESB Ecars network. For site issues, the operator lists 1890 372 387.
Where is the nearest charger with 50 kW or more to Ballee Road Park & Share Seven Towers Roundabout Ballymena (ESB Ecars)?
Maxol Ballymena (ESB Ecars) is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Ballee Road Park & Share Seven Towers Roundabout Ballymena (ESB Ecars)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ballee Road Park & Share Seven Towers Roundabout Ballymena (ESB Ecars)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ballee Road Park & Share Seven Towers Roundabout Ballymena (ESB Ecars)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- The Range · 120 kW · 1.2 mi